Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
The recovery The LDMG or the Chair of the Chair of LDRC seeks
committee can be LDRC can reconvene the approval of LDMG to
reconvened after it Recovery Committee if required. reconvene
has stood down from The LDMG is informed that the
an event if new Recovery committee will
issues come to light reconvene.
RECONVENE RECOVERY
e.g. Identification of The reconvened LDRC to
primary producers consult with LRC for briefing and
hardship some handover
weeks after the
event
COMMITTEE
Table 3 – Recovery Activation, Triggers and Actions
(Queensland Recovery Guidelines)
13.4 Transitioning from immediate/short term relief to medium level
recovery
The following are required before finalising the transition from short term relief to medium
level recovery:
Completion of a community needs analysis across the four pillars of recovery that
defines the community’s recovery needs and which establishes priorities for the
recovery effort and the resources required. This needs analysis will continue to be
updated throughout the recovery process.
Full membership of the Local Disaster Recovery Committee is finalised as are reporting
requirements to the LDMG, the DDMG and SRG.
Sub-groups are established as required and membership and terms of reference for
each are confirmed.
The Recovery Operational Plan outlining the aim, objectives and strategies for the
recovery effort is finalised.
The community engagement strategy is finalised and detailed in the Recovery
Operational Plan.
Sub-group action plans are well developed and outline relevant recovery programs and
activities.
13.5 Transitioning to long term recovery
Long term recovery requires functional lead agencies, Noosa Council and the community to
put in place systems and processes that ensure the ongoing provision of recovery support to
those who need it after the departure of recovery workers from the disaster area. These
arrangements should be included in the Operational and Action plans for the event.
13.6 Community needs analysis
Community need is the driver for all recovery operations. It is imperative that analysis of
community need is undertaken and regularly reviewed to ensure recovery operations are
correctly focused and resourced.
The purpose of a community recovery needs analysis is to pull together information into a
single, consolidated report; information on the physical impacts of a disaster, the economic
value of the damages and losses, the human impacts as experienced by the affected
population, and the resulting medium and long-term recovery needs and priorities.
Needs analysis begins when the Recovery process is first activated and continues through
all levels of recovery. Stand down from recovery is possible only when all community needs
20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.