Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                             Noosa Local Disaster Recovery Plan 2015/2016

                                              ‘Stand Up’ of LDMG.     DDC and SRG informed of               LRC and LDRC members
                                              LDMG assesses           establishment of LDMG                 in routine contact and
                                              event impact and        Response commences.                   monitoring email remotely.
                                              decides to activate     LRC monitors response activities      Local Disaster Recovery
                                              the LDRC                LRC analyses hazard impact or         Committee has an initial
                                              Immediate Relief        potential impact                      meeting for planning
                                              arrangements are        Relief and recovery planning          purposes.
                                              put in place            commences through needs               More regular reporting as
                                                                      analysis and recovery                 required by the LRC and by
                                                                      operational planning.                 the Disaster District and
                                                                      LDRC and Sub-group structures         SRG.
                                                                      finalised along with reporting        Community engagement
                                                                      requirements.                         and communication
                                                                      Deployments for immediate relief      strategy developed by
                      Recovery Lean Forward




                                                                      may be commenced by recovery          LDRC.
                                                                      functional agencies.
Response Stand Up




                                                                      Completion of initial needs
                                                                      analysis, finalisation of LDRC
                                                                      and Sub-group membership and
                                                                      issue of Recovery Operational
                                                                      Plan signal readiness to move
                                                                      the LDRC to Stand Up and
                                                                      commence Medium Term
                                                                      Recovery operations.
                                              Immediate relief        Transition arrangements from          Local Disaster Recovery
                                              arrangements            ‘response and relief’ to ‘medium      Committee and sub
                                              continue                term recovery’ undertaken             committees met regularly.
                                              Medium Term             including formal hand over from       Community engagement
                                              recovery                LDC to LRC.                           and communication
                                              commences.              Local Disaster Recovery               strategy implemented.
                                              Response Phase          Committee activated to operate
                                              moves to ‘Stand         from Noosa Shire Council
                                              Down’.                  offices.
                                                                      DDC and SRG informed of the
                                                                      activation level of the LDRC and
                                                                      transitional arrangements.
                                                                      Deployments from functional
                                                                      agencies continue to provide
                                                                      immediate relief response.
Response Stand Down




                                                                      Action Plans developed
                                                                      addressing the four functions of
                      Recovery Stand Up




                                                                      recovery.
                                                                      Participate in response debrief.
                                                                      Action Plans monitored and
                                                                      acted on.
                                                                      Regular reporting to the Noosa
                                                                      LDMG the DDC and the SRG
                                                                      continues.
                                              LDRC completes its      LDMG, DDC and SRG informed            As action items in the
                                              tasks contained in      of date for LDRC to stand down .      recovery plan are
                                              the operational plan.   Financial records consolidate.        completed LDRC members
                      Recovery Stand Down




                                              The community           Reporting requirements finalised.     and ultimately the LRC
                                              returns to normal       Participate in recovery review        resume standard business
                                              activities with         and assessment.                       arrangements.
                                              ongoing long term       Long term recovery                    LDRC stands down.
                                              recovery support        arrangements transferred to
                                              provided as required    functional lead agencies
                                              under pre-agreed        including Council.
                                              arrangements and        Return to Core Business
                                              processes.




                                                                                                                                    19
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.