2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
heritage listed properties and cultural icons
parks and gardens, public spaces and amenities
Each facility has the potential to help considerably during the recovery, but may be unable to
perform its community functions if damaged. The community is reliant on the restoration or
replacement of the above infrastructure to re-establish and function.
24.8 Infrastructure recovery planning
In planning infrastructure recovery, the Sub-group must:
undertake detailed damage and needs assessment
develop contingency plans to allow work to be done, despite the immediate difficulties
(including reduced transportation and communication services)
recognise the strong links between infrastructure recovery, economic recovery and
people’s response to the emergency or disaster
prioritise infrastructure restoration and its eventual recovery according to the importance
of the service that the infrastructure supports
recognise that people may be traumatised if they feel that their buildings have not
protected them or if they have suffered loss as a result of the event
recognise that these feelings of loss and deprivation will be heightened if the normal
community structures for support are not in place, and if the damage to infrastructure
places further threats on their continued wellbeing
understand that reconstruction of the infrastructure by external parties can alienate the
community unless the community is involved in the formulation of recovery strategies.
24.9 Key steps in infrastructure recovery
The key steps in infrastructure recovery planning include:
understanding what needs to be done to recover
identify external constraints and internal organisational restraints
prioritise tasks
put in place short term /interim fixes
identify the resource and material requirements
strategic planning (including long term recovery outcomes)
These are amplified in the table at Appendix 27.14.
24.10 Infrastructure needs assessment
Infrastructure assessments may be categorised into three separate activities:
Initial assessments which are usually undertaken in the first few hours after impact
during the response and immediate/short term (relief) stage of disaster management.
These assessments usually only provide an indication of the scale of the problem and
allow for response and relief operations.
Rapid impact assessments, which are usually conducted within the first 24 to 48 hours
after impact and involves the sending out of damage assessment teams to make first
hand assessments. Rapid impact assessment can be undertaken by Queensland Fire
and Emergency Services (Fire) is an example of this form of assessment.
Detailed assessments, which are normally conducted after the disaster response
phase and which inform the development of the Recovery Operational Plan and the
Infrastructure Recovery Action Plan. These assessments will normally be undertaken by
individual agencies and coordinated by a suitably qualified person appointed by the
Executive Director Infrastructure Services
47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.