When gathering information for infrastructure recovery assessments, the sub-group should
consider:
power
water
gas
roads and bridges
rail
communication networks (exchanges, etc)
damage to residential and commercial buildings
damage to public buildings including schools and hospitals
damage to recreation and cultural facilities
dam walls
hazard footprints, locations
displaced people
food supplies and food and merchandise supply chains
alternative access points
fences
Complications in damage and impact assessment often occur because:
owners of properties are not present at the time of inspection
professional advice may be needed and may not be readily available
organisations and individuals have differing priorities and agendas which impacts on the
timeliness and relevance of the impact/damage assessment
data on damage may not be complete due to inaccessibility
insufficient resources available to analyse impact data and needs
data reporting in a variety of incompatible formats
24.11 Reconstruction
Reconstruction is generally more complex that regular building and development activity.
Some of the key issues to be considered by the sub-group include:
24.12 Planning for reconstruction
Community consultation. Works should be prioritised and staged (i.e. temporary fixes
with more detailed solutions developed over longer time frames) in consultation with the
affected community.
Assessment. There are likely to be differing assessments e.g. insurance versus those
affected. Limited assessments done early may miss things or under report or over report
the scale and nature of damage. Damage may be missed by inexperienced or
overwhelmed assessors.
Environment. There is a need to reduce exposure to future risk or creation of new risk
from reconstruction effort
Regulation and frameworks. Temporary relaxation of planning regimes may allow
buildings and structures to be built that reinstate pre-disaster vulnerabilities or threats.
In addition, house repairs might not have to meet new building codes, whereas
rebuilding is usually to the new standard. Underinsurance and low damage write-offs
48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.