Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Noosa Local Disaster Recovery Plan 2015/2016

When gathering information for infrastructure recovery assessments, the sub-group should
consider:
   power
   water
   gas
   roads and bridges
   rail
   communication networks (exchanges, etc)
   damage to residential and commercial buildings
   damage to public buildings including schools and hospitals
   damage to recreation and cultural facilities
   dam walls
   hazard footprints, locations
   displaced people
   food supplies and food and merchandise supply chains
   alternative access points
   fences
Complications in damage and impact assessment often occur because:
   owners of properties are not present at the time of inspection
   professional advice may be needed and may not be readily available
   organisations and individuals have differing priorities and agendas which impacts on the
    timeliness and relevance of the impact/damage assessment
   data on damage may not be complete due to inaccessibility
   insufficient resources available to analyse impact data and needs
   data reporting in a variety of incompatible formats

24.11 Reconstruction
Reconstruction is generally more complex that regular building and development activity.
Some of the key issues to be considered by the sub-group include:

24.12 Planning for reconstruction
   Community consultation. Works should be prioritised and staged (i.e. temporary fixes
    with more detailed solutions developed over longer time frames) in consultation with the
    affected community.
   Assessment. There are likely to be differing assessments e.g. insurance versus those
    affected. Limited assessments done early may miss things or under report or over report
    the scale and nature of damage. Damage may be missed by inexperienced or
    overwhelmed assessors.
   Environment. There is a need to reduce exposure to future risk or creation of new risk
    from reconstruction effort
   Regulation and frameworks. Temporary relaxation of planning regimes may allow
    buildings and structures to be built that reinstate pre-disaster vulnerabilities or threats.
    In addition, house repairs might not have to meet new building codes, whereas
    rebuilding is usually to the new standard. Underinsurance and low damage write-offs
                                                                                               48
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.