Original source · versioned page text
Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan
AMENDMENTS & DISTRIBUTION
Amendments
(a) All controlled copies of this plan are version numbered and are subject to amendment as required and the
relevant pages within the plan are replaced. The revision system is administered by the administrator.
(b) Amendments are identified by the next consecutive issue indicator and the date of issue.
(c) The project manager is required to give consideration to a re-issue of the whole plan if it is considered that
the number of changes to the plan have a significant impact on the readability and cross referencing of
the document. All new issues supersede all previous issues.
(d) The document history table indicates all amendments. Recipients of new issues are responsible for the
approved disposition of superseded pages and the updating of their copy of the Plan.
(e) Amendments to this template may be made where specified by blue text with less than / greater than
symbols < > either side. Amendments are formatted to black prior to issue and the < > symbols removed.
Click on update table tab at contents page to incorporate changes.
(f) Amendments are to be approved by the project manager and the document history table amended and
signed.
Distribution
Construction management plan re-issues and page revisions are distributed to the selected controlled plan
holders as listed. Amendment control is as specified as above.
The plan is retained on site by the project manager who ensures that it is available to subcontractors, workers,
and others as necessary.
Where contractually specified, the client is issued with an uncontrolled copy, unless specified otherwise.
An electronic copy of the plan including amendments and updates are legal records and must be kept in the
electronic folder for the project and archived according to company recordkeeping requirements.
Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 2 of 14
Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.