Construction Management Plan
1.0 Introduction

1.1    Purpose
This construction management plan has been developed to describe how the project management team shall
implement and conduct its allocated site management responsibilities during the construction phase of the
Noosa Youngcare – Residential. A fundamental aim of this plan is to ensure all construction is properly
facilitated, integrated, and coordinated to deliver certainty to the objectives of the project.

This plan forms part of the DLC Integrated Management System which is accredited to IS0 9001 – Quality
Management, ISO 14001 – Environmental Management, and ISO 45001 Occupational Health and Safety
Management Systems.

1.2 Scope
This plan provides a holistic approach that:
        advises how the project management team will comply with the requirements of the contract
          relating to construction
        defines the project objectives and targets of particular relevance to the construction phase
        describes constraints specific to the construction phase and the project in general
        describes the process for the identification and control of risks specific to the construction phase
        details the proposed strategy for the construction phase, with particular regard to establishment
          resourcing, site organisation and construction controls.

1.3    Proposed Works
The proposed works require the construction of:

This type of construction will have several distinct phases that will require different material handling
strategies to optimise the construction works and minimise impact to surrounding streets, other stakeholders
(such as Noosa Council) and neighbours. Our material handling strategies and construction planning will
require consultation with stakeholders and authorities before implementation.

1.4    Site location
The proposed development site (refer Figure 1) is bounded by Viewland Dr Noosa Heads. The site area for the
works is approximately 3,105m² and is in a Community Facilities Zoning according to the Noosa Council Plan.




Authorised Managing Director              UNCONTROLLED WHEN PRINTED                                  Page 4 of 14
Commencement Date: 27 August 2020              IMS-4-T3 Version 3                      Review Date: 27 August 2022
Log in to download the original file

Construction Management Plan V2.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.