Construction Management Plan V2

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Construction Management Plan




Figure 1 – Site Location


1.5    Precedence
Where ambiguity is detected between the processes and requirements in this plan and the DLC management
system, then the processes nominated in this plan will take precedence.

1.6    Interface with other project plans and processes
The construction management plan forms part of an integrated set of management plans and should be read
in conjunction with these other plans.




Authorised Managing Director            UNCONTROLLED WHEN PRINTED                                Page 5 of 14
Commencement Date: 27 August 2020            IMS-4-T3 Version 3                    Review Date: 27 August 2022
Log in to download the original file

Construction Management Plan V2.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.