Original source · versioned page text
Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan Figure 1 – Site Location 1.5 Precedence Where ambiguity is detected between the processes and requirements in this plan and the DLC management system, then the processes nominated in this plan will take precedence. 1.6 Interface with other project plans and processes The construction management plan forms part of an integrated set of management plans and should be read in conjunction with these other plans. Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 5 of 14 Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.