Council archive · source document
100833_Council_Representation_260811 · MCU10/2065
Attached to the e-mail Representation on decision notice MCU10/2065.
Accordingly, we request that Condition 12 be amended to require the front fencing to be setback at least 1m and articulated, generally in accordance with the approved plans; or where on the property boundary less than 1.2m in height or of open construction. Condition 22 Condition 22 requires a 1.5m concrete footpath along the frontage of the site. Given that a 1.5m concrete footpath has not been required with other duplex developments in the street this condition is neither relevant to nor reasonably required and is an unreasonable imposition of the development. Further, given the physical width of the footpath reserve and intrusions such as a drainage grate, power box and light pole, a 1.5m concrete footpath is not achievable. Accordingly, we request that Condition 12 be deleted. Should you have any questions with respect to the above, please do not hesitate to contact me direct. Yours faithfully KHA DEVELOPMENT MANAGERS Scott Sobey DIRECTOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
100833_Council_Representation_260811.pdfRelated documentApplication case desk ↗
About this file
- File size
- 248 KB (small file)
- File type
No other editions are linked here.