PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 JULY 2018
a. Details of local native tree and understory species to be installed to the site
including upslope of Tree 28, the Endiandra sieberi (Corkwood) and over the
access tunnel.
b. Methods to be engaged in the establishment and maintenance of the required
landscaping including arborist recommendations.
c. Details of reinstatement of the soils to the roof of the access tunnel and
methods to ensure slope stability in both short-term and long term.
d. Landscaping details to ensure the development is visually screened with
vegetation when viewed from Main Beach by maintaining and enhancing the
existing canopy structure.
Geotechnical
65. The works must be carried out in accordance with the recommendations of a Slope
Stability Assessment which must be prepared by a suitably qualified person. The
Slope Stability Assessment must be submitted to Council prior to the issue of
Operational Works (Landscaping) The recommendations of the Slope Stability
Assessment must not be in conflict with the requirements of the Tree Protection Plan
or Construction Management Plan referred to in Condition 62.
Construction Management
66. The works must be carried out in accordance with an approved Construction
Management Plan for the tunnel access way development. The Construction
Management Plan dated 22 March 2018 must be amended to detail the removal,
storage and replacement of soils for the tunnel access way and submitted to Council
prior to the issue of a Development Permit for Operational Works (Landscaping).
67. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Work
(landscaping). The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The applicant has requested a minor change to the existing dwelling at 12 Park Road, Noosa
Heads.
The proposal seeks changes to the development approval for a detached house to include a lift
which is to be accessed via a subterranean pedestrian link.
The applicant details the proposed changes as follows:
The applicant seeks approval to construct a lift measuring 2m by 2m against the existing
dwelling house and also the associated pedestrian access from the approved timber
terrace fronting Park Road to the lower level of the lift structure and in addition to a
proposed extension of the existing deck to service the proposed lift on what is in effect the
middle or living area level of the existing dwelling house on this site.
The parents of the landowner live in Tasmania and at 80 and 77 years of age they are
becoming infirm. For the last 10 years the landowner’s parents have spent 3 months during
winter per year at the above property in respite from the colder temperatures in that
commonly lash Tasmania each winter.
Page 32 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.