Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-07-10 Planning & Environment Committee Agenda

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    10 JULY 2018


           a.    Details of local native tree and understory species to be installed to the site
                 including upslope of Tree 28, the Endiandra sieberi (Corkwood) and over the
                 access tunnel.
           b.    Methods to be engaged in the establishment and maintenance of the required
                 landscaping including arborist recommendations.
           c.    Details of reinstatement of the soils to the roof of the access tunnel and
                 methods to ensure slope stability in both short-term and long term.
           d.    Landscaping details to ensure the development is visually screened with
                 vegetation when viewed from Main Beach by maintaining and enhancing the
                 existing canopy structure.
           Geotechnical
     65.   The works must be carried out in accordance with the recommendations of a Slope
           Stability Assessment which must be prepared by a suitably qualified person. The
           Slope Stability Assessment must be submitted to Council prior to the issue of
           Operational Works (Landscaping) The recommendations of the Slope Stability
           Assessment must not be in conflict with the requirements of the Tree Protection Plan
           or Construction Management Plan referred to in Condition 62.
           Construction Management
     66.   The works must be carried out in accordance with an approved Construction
           Management Plan for the tunnel access way development. The Construction
           Management Plan dated 22 March 2018 must be amended to detail the removal,
           storage and replacement of soils for the tunnel access way and submitted to Council
           prior to the issue of a Development Permit for Operational Works (Landscaping).
     67.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
           must be submitted to Council, to secure performance of all conditions of this
           approval, prior to the issue of a Development Permit for Operational Work
           (landscaping). The cash bond or trading bank guarantee will be returned on
           performance of the conditions of approval less any costs incurred by Council in
           respect of enforcing performance of this permit. Council reserves the right to call
           upon the bond or guaranteed sum to effect compliance with conditions.
B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.   PROPOSAL
The applicant has requested a minor change to the existing dwelling at 12 Park Road, Noosa
Heads.
The proposal seeks changes to the development approval for a detached house to include a lift
which is to be accessed via a subterranean pedestrian link.
The applicant details the proposed changes as follows:
     The applicant seeks approval to construct a lift measuring 2m by 2m against the existing
     dwelling house and also the associated pedestrian access from the approved timber
     terrace fronting Park Road to the lower level of the lift structure and in addition to a
     proposed extension of the existing deck to service the proposed lift on what is in effect the
     middle or living area level of the existing dwelling house on this site.
     The parents of the landowner live in Tasmania and at 80 and 77 years of age they are
     becoming infirm. For the last 10 years the landowner’s parents have spent 3 months during
     winter per year at the above property in respite from the colder temperatures in that
     commonly lash Tasmania each winter.

                                                                                   Page 32 of 86
Log in to download the original file

2018-07-10 Planning & Environment Committee Agenda(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.