Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Appendix D - Bushfire Assessment · RAL26/0026

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                        PROPOSED SOLUTION

Impact on Ecologically Important Areas

PO2                                            No acceptable outcome provided                             The existing vegetated condition surrounding the
Bushfire mitigation measures do not                                                                       proposed building envelope is compliant with the
adversely impact on:                                                                                      requirements for the APZ as detailed in Section 5.2.1.
a) biodiversity values, connectivity and                                                                  No vegetation clearing or other ecological impacts are
ecosystem functioning; and                                                                                required to facilitate the bushfire mitigation measures
                                                                                                          detailed in this report.
b) the long term physical integrity of
waterways, wetland and areas of native
vegetation.

Water Supply for Fire Fighting Purposes

PO3                                            AO3.1                                                      Complies with AO3.1. The site is connected to a
Development provides an adequate               Premises are connected to the reticulated water supply. reticulated water supply with a minimum flow and
water supply for firefighting purpose                                                                     pressure of 10 litres a second at 200kPa at all times for
which is reliable, safely located and freely   Editor's note—For reconfiguring a lot, water supply        firefighting purposes.
accessible.                                    needs to provide for a minimum flow and pressure of
                                               10 litres a second at 200kPa at all times for firefighting
                                               purposes.

                                               OR

                                               AO3.2
                                               Where there is no available reticulated water supply,
                                               the premises has:

                                               a) an accessible dam, swimming pool or water tank
                                               available for firefighting purposes with an onsite water
                                               volume of not less than 5,000 litres; and


        AUGUST 2026                                   BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN                                                Page: 26
                                                                380 MCKINNON DRIVE, COOROIBAH

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D - Bushfire Assessment.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.