Council archive · source document
Appendix D - Bushfire Assessment · RAL26/0026
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION
b) a water supply outlet pipe 50 millimetres in diameter
fitted with a standard fire brigade fitting connected to
the water supply (other than where the water supply is
in a swimming pool or dam).
Editor’s Note—Water supply capacity for firefighting
purposes is in addition to water supply capacity for
other uses and activities on the premises.
Essential Community Infrastructure
PO4 AO4.1 The proposed development does not involve essential
Essential community infrastructure is able Development involving essential community community infrastructure.
to function effectively during and infrastructure is not located within a medium or high
immediately after bushfire events. bushfire hazard area.
OR
AO4.2
Where located in a medium or high bushfire hazard
area, development involving essential community
infrastructure is designed to function effectively during
and after a bushfire event in accordance with a Bushfire
Hazard Management Plan.
Editor’s Note— PSP8 Natural Hazards provides
guidance for assessing bushfire hazard risk and
preparing a bushfire hazard management plan.
AUGUST 2026 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 27
380 MCKINNON DRIVE, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Bushfire Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.