Appendix D - Erosion and Sediment Control Plan
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 1 – Best Prac�ce land clearing and rehabilita�on requirements. EROSION AND SEDIMENT CONTROL PLAN (36 Tunba Court, Cooroy Mountain) Risk Best prac�ce requirements CONSTRUCTION AND FINISHING PHASE All Cases All reasonable and prac�cable steps taken to apply best prac�ce erosion control measures to completed earthworks, or otherwise stabilise such works, prior to an�cipated rainfall-including exis�ng unstable, undisturbed, soil surfaces under the management or control of the building/construc�on works. Low Disturbed soil surfaces stabilised with minimum 70% cover within 20 days of comple�on of works within any works within any area of a work site. Moderate Disturbed soil surfaces stabilised with minimum 75% cover within 20 days of comple�on of works within any works within any area of a work site. High Disturbed soil surfaces stabilised with minimum 75% cover within 10 days of comple�on of works within any works within any area of a work site. (IECA Guidelines Table 4.4.7) CONSTRUCTION AND FINISHING STAGE Finishing works include final surface protections including batter protection, Longitudinal and transverse drainage protection, final landscaping and maintenance, final drainage works and progressive removal of erosion and sediment controls. As per Table 1 this project (high risk) requires 75% cover within 10 days. Temporary controls will not be removed until permanent measures are in place and site rehabilitation has occurred (at least 70 to 80% of soil surface must be protected from raindrop erosion). Any areas used for erosion and sediment control shall be rehabilitated. All stormwater drainage (i.e. yard stormwater inlets and roof plumbing) during construction requires protecting. The new shed’s roofs should be temporally or permanently diverted through the underground stormwater pipes. EROSION AND SEDIMENT CONTROLS Diversion Channel (refer Standard Drawing DC-01, Appendix A) To remain. Protect with topsoil and Exposed Soil Treatment.- Hydromulch @ 4T/Ha and seed mix (turf Exposed cut batter and table drain - Use soil binder at 1.5parts hydromulch. mix @ 40kg/Ha binder to 10parts water to protect exposed surfaces. This should (Maintain until 80% cover) provide 18 months protection. Assess the batter after 18 months Sediment barrier use Coir logs or Silt fence (refer and if the surfaces are showing signs of erosion re-apply soil Appendix A for Standard Drawings). Remove after binder or use erosion control blanket. 80% grass cover Client PROJECT TITLE DRAWING TITLE 36 Tunba Court, Cooroy Moun- Erosion and Sediment Control Plan Geoff & Tamara Hussin tain (new shed) Building and Construction Phase 19 Central Park Drive, Yandina 4561 www.aussieenvironmental.com.au Drawing No. ESCP04
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.