Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6

of 320

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Development subject to    Categories of development and assessment                 Assessment benchmarks for assessable
  overlay                                                                            development
                            If involving:                                            Biodiversity, Waterways and Wetlands Overlay Code
                            (a)    clearing vegetation identified as an area of
                                   biodiversity significance on a Biodiversity,
                                   Waterways and Wetlands Overlay Map;
                            (b)    clearing vegetation on land identified as
                                   riparian buffer area on a Biodiversity,
                                   Waterways and Wetlands Overlay Map; or
                            (c)    development on that part of the premises
                                   identified as riparian buffer area on
                                   a Biodiversity Overlay Map

  Building work not         Code assessment
  associated with a
                            If involving:                                            Biodiversity, Waterways and Wetlands Overlay Code
  material change of use,
  excluding demolition      (a)    clearing vegetation identified as an area of
  work                             biodiversity significance on a Biodiversity,
                                   Waterways and Wetlands Overlay Map;
                            (b)    clearing vegetation on premises identified as
                                   riparian buffer area on a Biodiversity,
                                   Waterways and Wetlands Overlay Map; or
                            (c)    building work on that part of the premises
                                   identified as riparian buffer area on a
                                   Biodiversity, Waterways and Wetlands Overlay
                                   Map

  Reconfiguring a lot        Code assessment
                            If involving premises identified as an area of           Biodiversity, Waterways and Wetlands Overlay Code
                            biodiversity significance or riparian buffer area on a
                            Biodiversity, Waterways and Wetlands Overlay Map.
  Clearing of vegetation in Code assessment
  the protected vegetation
                            If not exempt clearing                                   Biodiversity, Waterways and Wetlands Overlay Code
  overlay area
  Operational works         Code assessment
                            If involving:                                            Biodiversity, Waterways and Wetlands Overlay Code
                            (a)    clearing vegetation on land identified as an
                                   area of biodiversity significance on a
                                   Biodiversity, Waterways and Wetlands Overlay
                                   Map;
                            (b)    clearing vegetation on premises identified as
                                   riparian buffer area on a Biodiversity,
                                   Waterways and Wetlands Overlay Map; or
                            (c)    development on that part of the premises
                                   identified as riparian buffer area on a
                                   Biodiversity, Waterways and Wetlands Overlay
                                   Map.


 Table 5.9.3       Bushfire Hazard Overlay benchmarks and criteria
  Development subject to    Categories of development and assessment                 Assessment benchmarks for assessable
  overlay                                                                            development and criteria for accepted
                                                                                     development
  Bushfire Hazard Overlay ­ if within a medium or high bushfire hazard area or bushfire hazard buffer area



NOOSA PLAN 2020                                                                                                            Page 117 of 123
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.