Council archive · source document
08/0975 - Operational Works - Landscaping [As Published] · 142008.975
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?
bs No -Go Q1.2 oO Yes - (Compiete Form 1, Part C2) This application requires assessment by the relevant local govemment against the IDAS
Code in the Queensland Hentage Regulation 2003 If the development involves building work and the local
govemmentis not the Assessment Manager for the application, the local govemmenthas jurisdiction as Concurrence
Agency.
& 1 Regulaten, schedule 2 table Fein TIA, IPA, secton
for terms used 7 dav.
ye
ie
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[LX] No-Goa13 [] Yes
hedule pat 1. sibie 5 dem 1: IP Regulation. schedule 2 ble 2 ite
BOE: Wild Rweis Act 20S section 438
77; 12 Regulation, schedule 1, table 5 item 2 (wild nvet area): Wame Act 200
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA 1
‘ a
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
BX] No-cowar4 [_] Yes
PUPA, sthedale & 6:
# LOS secooa Ate
be 2 kets Tard 23
ironeretiel Prowetion Act 14,
WITHIN THE LIMITS OF A PORT.
1.4 Is any part of the premises within the limits of a port under the Transport Infrastucture Act 1994?
No -Go t Q1.5
(Yes
IP Raguaton, schedule 2 atic 2 lems Wand bt
DECLARED FISH HABITAT AREA oe ” eS ny
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
(No -Go 0 a16
oO Yes - ifanswers to questions in other sections of this checklist indicate that the proposed developmentis assessable under IPA, schedule
& this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, scheduie 2 table 2 item 26
‘COMMUNITY INFRASTRUCTURE |
4.6 Is any part of the premises designated for community infrastructure?
No -Go@ Q17 :
(Yes
IPR: on, Sehodule & tabie 2 iiewe 7
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section? [—] Yes
J? Regulaten, schedule 2 tbe 3 item 5
‘WASTE WATER MANAGE NENT
S E CcTIO N 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41 Is any of the proposed operational work assessable under a planning scheme?
(No - Go Q42 LJ Yes - (Complete Form 1, Part £) Answer Qs47.7 - 41.7below.
‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMVERCIAL OR INDUSTRIAL DEVELOPINENT INA WILD RIVER
AREA
4.2 (s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
KJ No -Gowaa3 ((] Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0975 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.