INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
shedele & pert i tabie 4 em 21? Re é:
le ths cada dors nati

 

 

 

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA oe eee 7
4.3 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

   
  

No -Gowaa4 [_] Yes

   

 

art tabie tems VA 1b, i Rey
Requistor, schedule t part a
area) Wid Reet Avi AG

 
 
  

   

 

4 fe 2 tate 2 tem
ditem hegetiton clear
wns SF and 43h

46H

2uem 3 hole
1 2A frege muon

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA }

44 ‘s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000 for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 200Q section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

[X] No -Gow 4s Ov Yes - Answer f4)and (b) below

ebay

 

7, Peet 4 tadle 4 iterts Sanit GA: Yeaier Ars 0) sectan SpA hed ives

 

45 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 200Q for taking or
interfering with artesian water (other than using a water tuck to pump watery?

& No Go 046 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). I NRWis notthe Assessment Manager for the application, the agency has judsdiction as Concurrence Agency.

IPA, schedule & part 1 lative 4 item 3b) 1? Regulation, de 2 table 2 item a IP Regutation, schanule 1, part 3 able 4 tem 3

Wild Rivers cade Note: the cade dors nat comendy contin applicable provisions for igkin faring with artesian water}

46 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000 for taking.
overland flow water (other than using a water truck to pump water)?

XI No -Gomaz7z [_] Yes- Answer (3) and (b) below

8 yuhyrtele & part i woke 4 shan Ford) IP Regelavion, schedule 2 tebie
Witt Reery Act Tia serton LA reineant wild mer diriars goa; Wid Rive:

   

 

 
    

 

 

BP Requtavan, scheduis 1, part habe @ nem 2 Water ACL CO vention UE cand oer atta),

   

“nde

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000 for taking or
interfering with subartesian water (other than using a water truck to pump watery?

IX] No -Gowa4e ((] Yes

1 table «tem
GEA wid wer rent Wd
nade (Note the code does aot currently coitain applicable provisions fer sub artesian wa

   

   
 

 

pdt d ble 4
iiteroring with subavtesian water as assessable}

  

 

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000 for
interfering with overland flow water (other than using a water tuck to pump water?

EX] No -cowaag C)¥ Yes - Answer both @)and (0) below

file 2 tote 7 wear @ HE Reghia ton,

 

fe 7, Dart 3 table 4 ite JA, Warer Ag? 7000 seca

   

EOE taetid

49 ls the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 (] No OO Yes
(ii) To increase the storage capacity of a referable dam by more than 10% 0 No O Yes

If yes to either or both (i) or (ii) above - (Complete Form 7, Part Ks) This application requires assessment by the Department of Naural Resources and

Water (NRW). if NRWis not the Assessment Minager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA schedule G part) ote 4 tem 4 IP Regulator, schedule 2 ible 2 tem 10

 

TAL WORK; WILD RIVER AREA Zz — |

 

4,10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?

Xx No -Gow Qa C} Yes - Answer (a) and @) below

tibie ftom & IP chedule 2 table 2 items 2 Mane ie i
ad Kanegement Act oi TOAA diye near grea)

     

 

non schedule | part 4 bible 4 tems 4A and &

   
 

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0975 - Operational Works - Landscaping [As Published].pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.