08/0975 - Operational Works - Landscaping [As Published] · 142008.975
LANDSCAPE
SPECIFICATION
Proposed Childcare Centre - 71 Pacific Ave, Sunshine Beach
EXTENT OF WORKS
Contractor should take full account of documentation of Civil
Engineering, Hydraulic Engineering and Electrical Engineering
Works. Landscape works are to include the following:
4. Edging to planting areas / Gravel Installation
2. Topsoil - Supply and incorporation
3. Turf Supply & Lay
4. Containerised Plant Material - Supply and installation
5. Garden Mulch - Supply and Spread
6. Irrigation & Drainage
a Shaping of garden areas
8. Maintenance of landscape works (90days)
1. EDGING TO PLANTING
Concrete/timber edging is to be installed for all garden areas
as required to the detail shown on sheet LAQ2.
= TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium
grade blended organic garden soil mix (sandy loam).
Soil supplier as well as intended mix is to be nominated.
Soil is to be mounded to facilitate good drainage to
hardstand areas (max. 1:3 grade) and is to finish 50mm
below edging after settlement. Organic additive
“dynamic lifter" or similar is to be incorporated throughout the
soil mix at the recommended rate.
A slow release fertiliser such as "osmocote” or its equivalent is
also to be incorporated with individual plantings in accordance
with the manufacturers recommendations.
2. TURF - SUPPLY AND LAY
a. “A” Grade Couch Species (or similar approved)
minimum sod depth - 25 mm.
b. Turf to be laid within 24 hours of being cut.
c. Allow for ground preparation and deposition of 50 mm
imported garden loam topsoil. Apply Dynamic Lifter or
equivalent as per manufacturers recommendations.
d. Turf to be close butted and rolled in accordance with
accepted practice to ensure a smooth even surface.
4. CONTAINERISED PLANT MATERIAL
Plant material is to be approved by superintendent prior to
planting. Planting is to be carried out in a manner consistent
with good horticultural practice. All >45 It. pot plant material
is to be guyed and staked as per Planting Detail — Advanced
Stock (Refer LAQ2). Smaller plant stock is to be staked as
necessary. Stakes shall not pass through rootball of plant at
time of planting or any time thereafter.
PLANT STOCK NOTES
Container sizes are noted with Pots in millimetres & Bags in litres.
Stock may be rejected if plants are:
a) Undersized proportional to specified container size or
if the root system is underdeveloped
b) Oversized proportional to specified container size or
severely root bound
c) Unbalanced or unchara cteristic of normal or specified
growth pattern for the species
d) Not suitably acclimatised for the specific environment
e) Diseased, infested with pests or suffering from other
form of significant stress
&: GARDEN MULCH
Organic Mulch: = Mulch shall be one inch hoop pine mulch to
all garden areas to a predominant depth of 100mm after settlement.
Mulch is to be graded to avoid placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
6. IRRIGATION & DRAINAGE
(Irrigation for the project shall be carried out b y an experienced and
reputable irrigation contractor - Tenderers intending to handle the
irrigation themselves will be required to demonstrate proficiency in
this area). A fully automated and programmable irrigation system,
with rainswitch, is to be provided to all planting areas. All fittings
are to be fully effective and inconspicuously placed. Irrigation is to
serve all garden and turf areas of the site with lines placed through
conduits provided. The system should provide re gulated
application to all areas. Irrigation systems is to be guaranteed for a
period of 12 months against faulty materials and workmanship.
Ensure all gardens and Sand Pits have adequate drainage through
Ag. Pipes and direct drainage away from the building at all times.
ch SHAPING OF GARDEN AREAS
Planting areas are to be fin ished in a gently mounded fashion
to facilitate drainage of excess water and to show planting to
best advantage. Contractor is to seek confirmation of finished
levels prior to final plantings and application of mulch.
All garden beds to be well drained. Drainage shall be provided
for in areas that stay saturated for extended periods to the
potential detriment of plantings.
8. MAINTENANCE OF LANDSCAPE WORKS
a. Monitor plant performance and st ress constantly and take
appropriate remedial action. Soil moisture levels are
critical during early establishment.
b. | Prune and shape all shrubs and trees as required
ie. Clear trunk to 1200mm & damaged branches
Remove all stakes at 90 day inspection
Fertilise all garden beds at 3 months (low phosphorus type)
e. Contractor shall maintain an up to date written log book
to record inspection observations and actions.
a9
did¥lS NVIG3SW
AUS-dul x 2
GRE-ban x2
BAN-rob x 4
AUS-dul x 1
CAL-MF x2 ay :
AUS-dul x 1
CAL-sal x 2
LEP-pet x 1
AUS-dul x 2
CAL-sal x 1
CAL-LJ x 4
CAL-sal x 1
AUS-dul x4
PUL-WG x3
CAL-LJ x3
BAN-rob x 5
PUL-WG x3
AUS-dul x 4
BAN-rob x 5
CAL-LJ x 5
PUL-WG x3
ACR-impx 2
Softfall
GRE-ban x2 |
BAN-rob x 2.
ACR-imp x 1)
Sandpit
Y --SYZ-leu x3
BAN-rob x 8
o
HAR-pen x 1
DiA-cae x 12
ALE-cor x 2
RE-banx2
LEP-petx2
SYZ-leux3 ||
——
ACR-imp x 3
f Sandpit
CAL-sal x 1
LEP-pet x 2
4 GRE-ban x 2 PUL-WG
CAL-sal x4
lon x 2
All existing trees
are to be removed.
COR-rub x 3
LOM-lon x 5
DiA-cae x 50
LOM-lon x 18
AUS-dul x 1
GRE-ban x 2
BAN-rob x 3
R.L 54.25
“4
COR-rub x 4
LOM-lon x 6
PUL-WG x2
ACR-imp x 1
GRE-ban x 1
CAL-LJ x3
COR-rub x6
COR-rub x 10
LOM-lon x6
COR-rub x 5
Proposed Childcare Centre
71 Pacific Avenue, Sunshine Beach
aoe:
SYZ-leu x 16
(300mm pots
@1000crs)
NEIGHBOURING
BUILDING at
800mm wide garden
bed planted with
Syzygium leuhmannii
with court order.
1m spacings in acc.
Mel-thy x 29
AUS-dul A3
WAT-flo x 1
(200L)
All existing trees
are to be removed.
AT-flo x 1
CAL-LJ x3
AUS-dul x 6
HAR-pen x 1
ACM-hem x 1
ACM-hem x 1
NEIGHBOURING
BUILDING
VEGETATION SCREENING:
Waterhousea floribunda to be provided
as mature specimens in 200L containers
where noted on Landscape Plan.
LEGEND
EXISTING TREES TO BE REMOVED
Species as noted on plan
: ‘SEWER LINE
Refer Engineering Plans for details
EXTERNAL HARD PAVEMENT
| Refer Engineering Documentation
RUBBERISED SOFTFALL SURFACE
Colour, patiern to be confirmed
CONCRETE EDGE
Extruded Concrete Garden Edging
LARGE AND SMALL TREE PLANTING
\Refer Planting Schedule
SCREENING AND SHRUB PLANTING
Refer Planting Schedule
NEW TURF
(| Refer Specification
AMENDMENTS
18-03-08 | ORIGINAL ISSUE FOR OPW APPROVAL
29-04-08
AMENDMENTS TO LAYOUT BCJ
21-05-08 | AMENDMENTS TO LAYOUT ALP
c a d
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burrell
2nd Floor, Esplanade & Second Bung, Caton Tree
email: andgraphik .
P.O. Box 18 Maroochydore 4558
Telephone: (07) 5443 4044
Facsimile: (07) 54434534
COPYRIGHT : No reprocuction of all or part of this crawing may be unccnaken without
‘The xpress wiitcn pomission of the author.
Project
Proposed Childcare Centre
71 Pacific Ave, Sunshine Beach
Clent / Project Managers
Tadpoles Early Learning Centre
Architects
Tabletop Architects
Drawing Tie
LANDSCAPE PLAN for
Operational Works Approval
NORTH ae
WINTER ‘PATH
W: £
‘
Nis ca Date: Morch 2008
1:125@ Al
2 Seam 1:250 @ AS
Job No: Drawing: Sheet Issue:
LGTP 1240 | LAO 01 OF c
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0975 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.