08/0975 - Operational Works - Landscaping [As Published] · 142008.975

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

PLANT SCHEDULE

Childcare Centre Sunshine Beach

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CODE BOTANICAL NAME COMMON NAME | MATURE | MATURE | POTSIZE | QUANTITY
HEIGHT | SPREAD |  U.N.O.
TREES
ACM-hem Acmena hemilampra Bush Satinash 6m
CAL-sal Callistemon salignus Bottlebrush 4m : oe
CUP-ana Cupaniopsis anacardioides Tuckaroo 7m SPECIFIED
HAR-pen Harpullia pendula Tulipwood 6m
SYZ4eu Syzygium leuhmannii Small leafed Lilly Pilly 6m
WAT-flo Waterhousia floribunda Weeping Lilly Pilly 8m
>
Oo
LARGE SHRUBS =
ACR-imp Acronychia imperforata Fraser Island Apple 3m 1.5m 200mL 7
ALE-cor Alectryon coriaceus Beach Bird's Eye 4m 2m 200mL 2 =
CAL-MF Callistemon ‘Mr Foster Mr Foster Bottlebrush 2.5m 1.5m 200mL 2 a
GRE-ban Grevillea banksii Red Silky Oak 3m 2m 200mL 1 g —
LEP-pet Leptospermum petersonii Lemon Scented Tea Tree | 4m 2m 200mL 6 x oO
5 >
SMALL SHRUBS TUSSOCKS & GROUNDCOVERS a
AUS-dul Austromyrtus dulcis Midyim Berry 1m 2m 150mL 43
BAN-rob Banksia robur Swamp Banksia 1.5m im 150mL 27
CAL-LJ Callistemon ‘Little John’ Little John Bottlebrush 1m 1m 200mL 31 CONCRETE EDGE
COR-rub Cordyline rubra Red Berry Palm Lily 2m 0.5m | 200mL | 40 a. |
-~ DIA-cae Dianella caerulea Flax Lily 0.5m 0.3m 140mL 67
LOM-lon Lomandra longifolia Mat Rush 1m 1m 140mL 55
MEL-thy Melaleuca thymifolia Dwarf Melaleuca 1m 1m 140mL 55
PUL-WG Pultenea ‘Wallum Gold' Pea Flower 2m 1.5m 150mL 15
PHE-woo Phebalium Woombye Prostrate Phebalium 0.3m 1m 140mL 4

 

 

 

 

 

 

 

NOTE:
Advanced tree stock planting

street trees to have min. 1.2m
clear trunk

 

1800 x 50 x 50 Hwd stakes. All

pointed & driven vertically into
the ground outside the rootball

Approved securing material
such as Rubber tree ties or
50mm jutemat/hessian ties

in figure 8 loops secured
loosely to tree & fixed to stake
with flathead galv. nails

 

SPADE EDGE:
Ensure neat spade
edge is maintained
to all street trees

 

 

| pee i Mound at pit edge
Turf to 100mm deep friable
specified Z imported topsoil with
edge 20% organic content, light
compaction only.

900 depth and backfilled with
friable soil with max.
2% organic content, light

   

=
I

 

 

 

3 A r
<|< XA compaction only.
2 >8 RAR
2 RARE
&\5 ‘ Re Slow release fertiliser to
Ss 1 AS j i
8 : ive s manufacturers specifications
g
O¢ Tae
3 Fe Backfill original subgrade

 

o SAAAB mater. IGP COMPOON ony

Tes re Cultivate subgrade

SS to 150mm depth
oo (Generally 2x width of rootball) "

PLANTING DETAIL - ADVANCED STOCK 1:25@A1

selection to council approval. All

stakes to be chamfered, centrally

100mm nom. composted organic
mulch or council approved. Form
shallow dish drain to base of tree.

Tree pit to be excavated to min.

 

Select Garden Bed Mulch
Planting Area

Turf
100

We pyy yey

25
yf 100
MIN

ee

Topsoil

EXTRUDED CONCRETE EDGE DETAIL NTS

 

   
 
 
  

 

 

 

 

 

 

 

25 MPa concrete, pressure washed to expose aggregate.

A 0.5m2 finished sample must be provided to the site
superintendent prior to commencement for approval. The
sample may form part of the final product. Amendments to the
aggregate mix ratios, depth of aggregate exposure or CCS
saturation, may be made at this stage.

F62 Reinforcement located

central to the concrete width.

120
{ “a Compacted sub-base and
oo | SUb-grade Supply proof of
compaction to site
superintendant.

 

JOINTS

+ Contraction joints to be at minimum 2.0m centres. Joints to be 25mm depth saw cut or
approved equivalent.

+ Expansion joints to be at minimum 12m centres. To be located at edges of tile bands where
possible. 10mm thick closed cell cross linked polyethylene foam or approved equivalent.

FOOTPATH PAVEMENT - DETAIL

 

 

 

 

 

 

 

  
 

 

AMUIO

CONCRETE

FOOTPATH

FORT PLAY EQUIPMENT TO
AUST. STDS. SPEC. BY BTHERS.

  
 
 
 
  
 
 
 
 
   

°
C,
x
\— 100x100HWD “QO
TO AQ TIMBER EDGE
D4 Pa SO 100 x 100 HWD
4 a \V TIMBER EDGE

RUBBERISED SOFT
EDGE TO ALL SANDPITS

R.L 54.25

Sandpit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHILDRENS
PLAY EQUIPMENT
AND SHADE

STRUCTURE
DESIGN BY OTHERS

ALL EXISTING TREES
ARE TO BE REMOVED

 

    
    
   

NEIGHBOURING

 

 

 

 

 

BUILDING
—. 800mm EDGED
GARDEN BED
NEIGHBOURING
BUILDING
100mm MULCH
LAYER
PROVIDE 90 DIA SLOTTED
PROVIDE IMPERVIOUS PIPE WITH GEOTEXTILE
MEMBRANE COATING TO SURROUND AND CAPPED TO
INSIDE OF PLANTER TO TOP FOR MAINTENACE ACCESS
MANUFACT. SPECIFICATIONS ns

PROVIDE GEOTEXTILE SURROUND
TO DRAINAGE CELL & AGGREGATE
LAYER

PROVIDE TOPPING LAYER

   

 

TO OBTAIN FALLS TO DRAINAGE
POINTS

PROVIDE AGGREGATE LAYER oa

TO TOP OF DRAINAGE CELL WITH
GEOTEXTILE SURROUND.

 

100mm Radius curve to
corner of planters

PODIUM PLANTER DETAIL

 

 
 
   

MATCH BUILDING

PROVIDE IMPORTED
PODIUM MIX

PROVIDE DRAINAGE CELL
TO BOTTOM & SIDES.
CUT TOFIT (5mm TOLERANCE)

DRAINAGE LINE TO
CONNECT TO STORMWATER
DRAINAGE SYSTEM

 

 

 

   

LEGEND

EXISTING TREES TO BE REMOVED
Species as noted on plan

SEWER LINE
Refer Engineering Plans for details

EXTERNAL HARD PAVEMENT
Refer Engineering Documeniation

CONCRETE EDGE
Extruded Concreie Garden Edging

 

 * “+ RUBBERISED SOFTFALL SURFACE
‘| Colour, pattern to be confirmed

ge! LARGE AND SMALL TREE PLANTING
Refer Planting Schedule

¢ | SCREENING AND SHRUB PLANTING
"| Refer Planting Schedule

SSS
><| NEW TURF
Refer Specification

ULCHED AREA
Refer Specification

  

 

AMENDMENTS
issue | date

 
     

ORIGINAL ISSUE FOR OPW APPROVAL
AMENDMENTS TO LAYOUT
AMENDMENTS TO LAYOUT

 
     

 

 

c a d
LANDGRAPHICS

LANDSCAPE ARCHITECTS

Principal: Robert J. Burrell
2nd Floor, Esplunude & Second Bulking, Cotton Tree

Facsimile: (07)5443 4534

 

COPYRIGHT: No mprocuction of all or pan of this crawing may be uneertaken wahout
the xpress waitin permission of the author.

 

 

Project

Proposed Childcare Centre
71 Pacific Ave, Sunshine Beach

Clent / Project Managers

Tadpoles Early Learning Centre

 

Architects

Tabletop Architects

 

Drawing Title

LANDSCAPE DETAILS for
Operational Works Approval

 

 

 

 

LGTP 1240 | LA02

 

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0975 - Operational Works - Landscaping [As Published].pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.