4.3. Bioretention Basin Maintenance
The proposed bioretention basin will require consideration and management during both the construction
period and maintenance period of the development. In order to establish vegetation and treatment functions
in the bioretention systems, the filter media will require protection from the common pollutants generated in
the construction phases of the development. During the operational phase, regular maintenance is required to
ensure a comprehensive vegetation establishment, a critical component in stormwater pollutant uptake.
Below are details on the general maintenance periods and the requirements for the construction and
maintenance periods.
4.3.1. ‘Construction Period’ Maintenance
Erosion and sediment control devices will be installed at the commencement of the works to capture and treat
runoff during construction works. The sediment control devices should be cleaned out as required and at the
end of the works. During the construction stage, all sediment control devices are to be inspected weekly, after
runoff generating rain events and prior and after prolonged site shut downs (e.g. holiday periods). Proposed
bioretention basins may be excavated and used as a sediment basin.
4.3.2. ‘Maintenance Period' Maintenance
The bioretention basins will be temporarily turfed during the maintenance period. Once construction of the
industrial units is complete, the turf will be removed and the basins will be vegetated appropriately.
5. Stormwater Quantity Management
The majority of the existing site is considered to be hardstand as the current use of the site is for storing
landscape supplies which are normally delivered and taken away from the site using heavy vehicles. Due to the
proposed development the fraction impervious of the site has decreased slightly therefore no retention is
required to manage stormwater runoff. The actual runoff to the council stormwater network will be reduced
further due to the installation of the bioretention basin on the site.
The subject site has an existing stormwater manhole which is identified to be the lawful point of discharge.
The existing underground stormwater network is currently connected to this pit. The stormwater manhole is
located in Acton Street which discharges to an existing 1650mm RCP stormwater main. The existing
stormwater network ultimately discharges to Eenie Creek located approximately 600m to the south.
A stormwater drainage system is proposed for the development which incorporates one bioretention basin
and an underground drainage network to connect to the existing drainage. The northern portion of the site
will discharge stormwater to the west by connecting to the existing stormwater gully pit on the site’s Leo Alley
Road frontage. In the event that the stormwater pit over tops stormwater will discharge as overland flow to
the grassed area through the site, located to the south as it does in the existing case.
The southern portion of the site will discharge to the existing stormwater manhole located in Action Street to
the east. In the event that the proposed network overtops stormwater will discharge as overland flow to the
Acton Street roadway and enter the existing stormwater network via the existing gully pits located
downstream on Acton Street as it does in the existing case.
A majority of stormwater discharging from the site in the developed case will discharge to a bioretention basin
which has an extended detention depth of 300mm. This equates to approximately 8.4 kL of total stormwater
detention storage for the site. The stormwater detention volume will further reduce peak discharge.
240127 – Stormwater Management Plan 9 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.