Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Reference Documents - MCU24 0141 & OPW24 0184 [As Published]

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

              1. Introduction
              This Stormwater Management Report has been commissioned by Aboda Design Group, to support a combined
              Material Change of Use (MCU) and Operational Works application with Noosa Shire Council (NSC) for a
              proposed Low/Medium Impact Industry Warehouse development at 4 Leo Alley Road, Noosaville. The subject
              site is described as Lot 259 on MCH4540 and has an area of 0.3039ha. The proposed site location is identified
              in Figure 1.
              The purpose of this report is to demonstrate that the proposed development generally complies with the
              stormwater quality and quantity management requirements of the NSC planning policies (PSP), Queensland
              State Planning Policy (SPP 2017), Queensland Urban Drainage Manual 2017 (QUDM), Noosa Plan 2020 Water
              Quality and Drainage Code and other relevant codes and guidelines.
              The minor storm event is the 10% Annual Exceedance Probability (AEP), and the major storm event is the 1%
              AEP event in accordance with NSC PSP05.4.1E, industrial development category.




              Figure 1 - Site Location (Nearmap)

              1.1.      Reference Information
              The documents in the table below have been attached as supporting information to this report, they can be
              found in the appendices.

                Document Name                   Source               Comment                                  Appendix

                Engineering Drawings            Infinity CE          Stormwater Engineering Drawings          A
                Detail and Contour Survey       Minstaff Survey      Existing Site Survey                     B
                Development Plan                Aboda                Architectural Plans                      C




240127 – Stormwater Management Plan            3 of 10
Log in to download the original file

Reference Documents - MCU24 0141 & OPW24 0184 [As Published].pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.