Stormwater Calculations Infinity CE MUSICX Outputs D
Pre-Lodgement Notes NSC Pre-Lodgement Notes E
2. Existing Site
2.1. General
The existing site contains an industrial building and carpark. The site falls from the North to the South-Eastern
corner with levels ranging from approximately 11.8m to 10.1m AHD, with multiple less than 1.0m retaining
walls controlling the slope of the site. The proposed development is currently within the Medium Impact
Industry Zone, as per the Noosa Plan 2020.
2.2. Drainage and Catchments
Runoff within the subject site presents as sheet flow and internal drainage which is directed to the South-
Eastern corner where it enters the existing stormwater network via a 1650mm pipe to a manhole on Action
Street. There are no existing kerb adaptors on the frontage of Leo Alley Road or Action Street, the existing
roofwater currently discharges to the internal drainage. An existing stormwater gully pit is located along the
frontage within Leo Alley Road that captures a large portion of the upstream catchment with flows directed via
a piped network through the subject site. Refer to Figure 2.
Figure 2 - Existing Stormwater Network (NSC Maps)
240127 – Stormwater Management Plan 4 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.