Original source · versioned page text
Reference Documents - MCU24 0141 & OPW24 0184 [As Published]
Very large file (16.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Conductivity 500 µS/cm
4.2. Water Quality Modelling
4.2.1. MUSICX Model Parameters
The MUSIC Modelling Guidelines – November 2018 was used to source base and storm flow concentration and
runoff generation. The model used rainfall data published by eWater from the Cooroy Composite Station, over
a ten (10) year period (1973-1983) at a 6 minute time step (as nominated in the Water by Design’s MUSIC
Modelling Guidelines. All source nodes were set up in accordance with this guideline, specifically for the use of
split catchments. Commercial and industrial rainfall-runoff parameters and industrial pollutant export
parameters have been used for each split catchment course node. No routing of drainage links was adopted
for the purpose of taking a conservative approach. This approach assumes that the flow through the drainage
system takes no time, which overestimates the likely pollutant load. MUSICX version 1.40 was used for this
assessment.
MUSIC models are included in Appendix D.
4.2.2. Scenario Method
The proposed development was split into two (2) catchments, with individual treatment options. Each
catchment was modelled using split catchment nodes comprised of roof, carparking and landscaping nodes (as
appropriate). It is considered that sub catchments are not required to meet the pollutant reduction targets as
they both discharge to the same location. The modelling demonstrates that discharge from the site meets
load reduction targets. The total development is approximately 0.29ha and consists of 17 industrial units. The
development has been split into two catchments of approximately 0.23ha and 0.06ha.
Refer to Table 3 and Appendix A for more detail.
Table 3 - Catchment Characteristics
Roof Area (ha) Driveway Area (ha) Landscape Area (ha) Total Area (ha)
Impervious Percentage 100% 100% 0%
Catchment 1 0.1670 0.0377 0.0280 0.2327
Catchment 2 0 0.0563 0.0034 0.0597
4.2.3. Proposed Stormwater Treatment Train
The stormwater runoff from catchment 1 will be treated with a bioretention basin and swale. Catchment 2
will discharge to a vegetated swale before entering the stormwater network. The filter media of the
bioretention basin was modelled using a total nitrogen content of 400mg/kg and an orthophosphate content
of 30mg/kg. This is in accordance with MUSIC Modelling guidelines (consultation draft) by Water by Design
(2018).
Refer to Table 4 for the bioretention basin characteristics.
240127 – Stormwater Management Plan 7 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.