NOOSA COUNCIL IDAS Development Application Decision Notice                                                11 of 17


       The clearing shall occur sequentially commencing with the new road and then continuing from north to
       south through the site, with each stage being stabilised with grass or other suitable material as approved
       by Council’s Manager Land Development sufficient to contain and control the surface within one month of
       clearing of vegetation for the stage and within 2 weeks of the completion of earthworks for the stage, and
       prior to the next stage being cleared.

       Particular care shall be taken not to disturb vegetation adjacent to existing creeks and watercourses and
       open space areas. The open space and statutory covenant areas (OS3, OS6, OS2, OS4, OS7, Lot 4
       covenant area) shall be protected from clearing except in accordance with the approved Site
       Rehabilitation Plan.
51.    Vegetation removal, tree felling and lopping adjacent to vegetation to be retained in the open space areas
       shall be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation,
       trees and habitat.

52.    Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums). If
       wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree.

53.    All cleared vegetation shall be suitably processed or removed from the site by a method approved by
       Council. Cleared vegetation is to be suitably processed by one of the following methods:-

       53.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
             heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
             between edges of heaps.

       53.2. Disposal for firewood.

       53.3. Disposal for landscaping purposes.

       53.4. Transport to alternative site for breaking down materials provided that all necessary permits have
             been obtained to allow the alternate site to be used for this purpose.

       53.5. The disposal method for clearing works is to be submitted in conjunction with an application for a
             Development Permit for Operational Work. The Applicant is advised that other methods may be
             considered provided full details of the method are submitted.

       53.6. The Applicant is advised that burning off is an unacceptable method of disposal.

54.    All earthworks shall be adequately stabilised with a minimum of 50% ground cover per square metre at
       acceptance on-maintenance; and achieve a stable and robust cover of minimum 80% per square metre at
       off maintenance inspection after 1 year and prior to the sealing of the survey plan by Council.

Weed and Pest Removal

55.    In order to protect the ecological values of the site the following shall apply:

       55.1. prior to first entering the site, all construction machinery and vehicles shall be washed down to
             remove soil that may contain weed seeds, soil pathogens and pest species;

       55.2. all nursery stock shall be weed, pest and disease free and certified as such by the supplier;

       55.3. all imported fill, soil, gravel and other construction and landscaping materials shall be weed, pest
             and disease free and certified as such by the supplier;

       55.4. all mulch used on the site shall be weed, pest and disease free and certified as such by the
             supplier;

       55.5. all mulch produced on-site by mulching cleared vegetation and trees shall specifically exclude
             material (particularly seeds) from weed species (eg. lantana, asparagus fern and umbrella trees);
             and

       55.6. the certificates referred to above are to be obtained prior to the use of the material on-site and to
             be made available to Council.

56.    Soil disturbance in the open space areas shall be kept to a minimum to avoid weed proliferation.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001242.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.