Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Decision Notice - 010.2007.00001242.001 [As Published] · 142007.1242

of 17

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  7 of 17


2.     A revised erosion and sediment control plan shall be submitted to Council for approval prior to the pre
       start meeting. The revised plan shall be prepared in accordance with the manual titled Soil Erosion and
       Sediment Control – Engineering Guidelines for Queensland Construction Sites prepared by The Institute
       of Engineers, Australia Queensland Division and shall include additional features to control the movement
       of sediment from the disturbed areas. The revised plan shall include but not be limited to descriptions of
       the maximum for disturbed areas, temporary sediment control basins, internal cut off drains and other
       interim measures such as sediment fencing.

3.     No works shall be undertaken within the covenant area within proposed Lot 4. In this regard Drawing No
       M30148/C36D dated 26 November 2007 by Barlow Gregg VDM shall be revised to indicate that the
       proposed swale drain is setback 3m from the western and south-western property boundary. The revised
       drawing shall be submitted to Council for approval prior to the commencement of any works within Lot 4.

4.     Only plans having the stamped approval of the relevant Council Officer shall be used on site for
       construction purposes. In this regard copies of the stamped approved plans shall be provided to all
       contractors and additional copies are to be made available on site.

5.     Those sections of the proposed footpath located on the north-eastern side of the intersection of
       Production Street and Rene Street shall be setback a minimum of 900mm from the kerb line at the
       intersection. The alignment of the footpath shall then taper to the alignment at the common boundary of
       proposed Lot 2 and Lot 307 SP103421 as shown on drawing No M3048-C16B dated 8/10/07 prepared by
       Barlow Gregg VDM.

6.     Bike Lane markings shall have a broken edge line for a minimum of 25m on the departure and entry legs
       of the proposed roundabout.

7.     The collection, treatment and disposal of stormwater runoff generated by the development shall be
       undertaken generally in accordance with The Stormwater Management Plan Part A Stormwater Quantity
       and Part B Stormwater Quality reference M3048 dated Amended October 2007 prepared by Barlow Gregg
       VDM.

8.     All earthworks, including banks and batters, are to be wholly contained within the relevant lot.

9.     The applicant shall monitor the quality of stormwater runoff exiting the sites for 3 years to ensure that the
       waters achieve the water quality objectives as set out by Noosa Council and as described in The
       Stormwater Management Plan Part B Stormwater Quality reference M3048 dated Amended October 2007
       prepared by Barlow Gregg VDM. Should the monitoring indicate that the objectives have not been met or
       indicate that the objectives may not be met the applicant shall undertake the necessary works to ensure
       the objectives are achieved.

10.    The expansion joints in any bikeway/footpath shall be “sawcut” not trowel jointed.

11.    The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
       Manual using soaked CBR tests of the subgrade.

       The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
       Land Development for approval prior to placement of pavement material.

12.    The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm
       below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with
       Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

13.    Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
       accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

14.    Suitable sediment control devices shall be temporarily installed into the first existing external downstream
       stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.

       These devices are to remain in place during the civil works and construction phases of the development.

       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
15.    Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
       intention to commence works to arrange a “pre start” meeting regarding the civil works.



NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001242.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.