NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 17
2. A revised erosion and sediment control plan shall be submitted to Council for approval prior to the pre
start meeting. The revised plan shall be prepared in accordance with the manual titled Soil Erosion and
Sediment Control – Engineering Guidelines for Queensland Construction Sites prepared by The Institute
of Engineers, Australia Queensland Division and shall include additional features to control the movement
of sediment from the disturbed areas. The revised plan shall include but not be limited to descriptions of
the maximum for disturbed areas, temporary sediment control basins, internal cut off drains and other
interim measures such as sediment fencing.
3. No works shall be undertaken within the covenant area within proposed Lot 4. In this regard Drawing No
M30148/C36D dated 26 November 2007 by Barlow Gregg VDM shall be revised to indicate that the
proposed swale drain is setback 3m from the western and south-western property boundary. The revised
drawing shall be submitted to Council for approval prior to the commencement of any works within Lot 4.
4. Only plans having the stamped approval of the relevant Council Officer shall be used on site for
construction purposes. In this regard copies of the stamped approved plans shall be provided to all
contractors and additional copies are to be made available on site.
5. Those sections of the proposed footpath located on the north-eastern side of the intersection of
Production Street and Rene Street shall be setback a minimum of 900mm from the kerb line at the
intersection. The alignment of the footpath shall then taper to the alignment at the common boundary of
proposed Lot 2 and Lot 307 SP103421 as shown on drawing No M3048-C16B dated 8/10/07 prepared by
Barlow Gregg VDM.
6. Bike Lane markings shall have a broken edge line for a minimum of 25m on the departure and entry legs
of the proposed roundabout.
7. The collection, treatment and disposal of stormwater runoff generated by the development shall be
undertaken generally in accordance with The Stormwater Management Plan Part A Stormwater Quantity
and Part B Stormwater Quality reference M3048 dated Amended October 2007 prepared by Barlow Gregg
VDM.
8. All earthworks, including banks and batters, are to be wholly contained within the relevant lot.
9. The applicant shall monitor the quality of stormwater runoff exiting the sites for 3 years to ensure that the
waters achieve the water quality objectives as set out by Noosa Council and as described in The
Stormwater Management Plan Part B Stormwater Quality reference M3048 dated Amended October 2007
prepared by Barlow Gregg VDM. Should the monitoring indicate that the objectives have not been met or
indicate that the objectives may not be met the applicant shall undertake the necessary works to ensure
the objectives are achieved.
10. The expansion joints in any bikeway/footpath shall be “sawcut” not trowel jointed.
11. The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
Manual using soaked CBR tests of the subgrade.
The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
Land Development for approval prior to placement of pavement material.
12. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm
below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with
Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
13. Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
14. Suitable sediment control devices shall be temporarily installed into the first existing external downstream
stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the development.
The location and type of device to be installed shall be established at the “pre start” meeting with
Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
15. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
intention to commence works to arrange a “pre start” meeting regarding the civil works.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001242.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.