Decision Notice - 010.2007.00001242.001 [As Published] · 142007.1242

of 17

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  8 of 17


16.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.

17.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

18.    Please provide one copy (A3 size) of the approved plans and a copy of the job specifications for Council’s
       Construction Technical Officer.

19.    The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
       provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
       site meetings. Construction Technical Officer will also sign the form at each stage when conditions
       required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
       inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
       “On Maintenance”.

20.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

21.    An inspection is to be carried out with the relevant Council officers, the Contractor and Supervising
       Engineer after road centrelines, drainage centrelines, proposed boundaries and open space boundaries
       have been marked on site, and prior to clearing being carried out. This inspection is to deal with the limits
       of clearing to be carried out for this development. This meeting is to take place prior to the “Pre-start”
       meeting.

22.    Council standards shall apply to these works unless otherwise modified herein.

23.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the sealing of the survey plan or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the sealing of the survey plan.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the sealing of the survey plan.

24.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

25.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

26.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

27.    Safe pedestrian and vehicle access on Eenie Creek Road, Rene Street and Hoffman Drive shall be
       maintained at all times. Should footpath / road closures be necessary to carry out construction works,
       Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001242.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.