Response to Info_Request_stg6 REC14 0009 2-10-14 Callaghan Toth
Attached to the e-mail REC14/0009 Information Response.
Callaghan & Toth Consulting Engineers Pty Ltd ABN No. 45140292324 8/41 Sunshine Beach Road Noosa Junction P.O Box 2305 Noosa Heads 4567 Callaghan & Toth www.callaghanandtoth.com.au Civil, Environmental & Hydraulic Engineers Ph: 07 5474 9081 Fax: 07 54749041 2"? October 2014 Glen Conforti Development Planning Officer Noosa Council Via Email: [email protected] RE: Response to Information Request for Application to Reconfigure a Lot — 2 Lots into 6 Lots REC14/0009 Stage 6 In response to the Information Request dated 17 July 2014 the following details are offered (Council information request items in italics): Planning 1. Please provide the applicant’s intentions for vegetation rehabilitation and Park dedication should stage 3 be deferred or never occur. Response: Please refer to enclosed staged revegetation plans 1225-89a, and 1225-90a which show revegetation extents for stage 5 and 6. The stage 5 and 6 works will be to revegetate the eastern watercourse. Stage 3 will be future works to western watercourse. Max Watterson has prepared Park dedication plans which will be included in this information request response. Ecology 2. Provide an amended plan that meets the provisions of the Biodiversity Overlay Code. Response: The creek adjacent Stage 5 and 6 is partly mapped as Riparian Buffer Area on the Biodiversity Overlay map 3.1, which is shown on plan 1225-89a. e It is proposed to dedicate 10m from top of bank along this watercourse for its whole length to ensure the biodiversity values of the watercourse are maintained. One exception is adjacent to lot 15 which has a narrower width of 7.5m over 25m. This has been offset by increasing the dedication to 20m next to lot 16 and extending a 10m wide zone 70m south of the Biodiversity Overlay map 3.1. Please refer revegetation plan 1225-89a which shows extents of proposed planting as shaded areas. e It is proposed to rehabilitate 10m either side from the top of bank for part of this watercourse and 5m either side from the invert for the part of the watercourse which is not mapped as Riparian Buffer Area. This additional area is shown in relation to X:JOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC 14 0009 17-7-14.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
Council Riparian Buffer Area on revegetation plan 1225-89a. This additional rehabilitation south of the mapped Riparian extent provides an offset area for other areas of Council mapping that are not practical to re-vegetate. e Rehabilitation Plans have been prepared detailing the weed control, planting and maintenance requirements for these riparian areas that will be rehabilitated. e Itis considered that the Riparian Buffer Area as mapped on OM 3.1 is schematic to indicate areas to be assessed on the ground and determine areas to be protected. e The riparian buffer provided adjacent to Lots 14, 15 and 16 includes all the existing riparian vegetation along this watercourse, i.e there is no riparian vegetation in Lot 14, 15 and 16. Most of the site including these lots is grassed as a result of previous clearing and farming. e By providing generally 10m from top of bank and rehabilitating this area the development retains the existing habitat, maintains the existing wildlife corridor, maintains the stability of the watercourse, and will enhance its values by removing weeds and planting native species where infill planting is required. e As such it is considered that the Biodiversity Overlay has been complied with by providing a setback of a suitable distance to protect the values of the watercourse and riparian zone. And by rehabilitating this area the biodiversity values of this watercourse will be enhanced. e Therefore the boundaries to Lot 14, 15 and 16 will be changed as per plan 1225-89a. 3. Please provide a proposal plan with the Noosa Plan’s Biodiversity Overlay overlaid to provide clarity Response: Please refer to revegetation plan 1225-89a which shows the Biodiversity Overlay Riparian extent. Engineering and Hydrology 4. Provide a Flood Report for the development. Response: Please refer to Brisbane Stormwater Management (BSM) Flood Report dated 15-9-14. 5. The lot layout may require amending subject to Councils acceptance or other revision of the Stormwater Detention and Flood Report. Response: The Flood report has been recently revised to address Council concerns so allotment layout should not need to change. X:JOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC14 0009 17-7-14.doc
Page 3
6. Provide a preliminary engineering design for the necessary road works. The design must be prepared by an RPEQ and extend from the existing formation in Cordwood Drive the the full length of ‘Masonry Street’. The design must include: Levels (natural surface and finished design) Cross Sections and Longitudinal Section All banks and batters Stormwater Existing services Temporary Turnaround (if required) ~D9AOTD Response: Please refer to enclosed layout plans 1225-61a, 1225-62a, Longitudinal Section 1225-65a, Cross sections 1225-66 to 1225-72 inclusive (revision a). On enclosed plan 1225-80a we show existing water main, communications, and underground electrical that is on the western side of Masonry Street. These services currently terminate at the southern boundary of Lot 12 SP248255. There are also existing sewer and water mains traversing the property in easements, see 1225-60a. It is planned to complete stages 5 and 6 in one Construction Contract therefore a temporary turnaround is not required. 7. Provide comment on the potential affects on the flood plain created by the proposed roadworks. Please note that the Q100 line indicated on the plans is part of the adjoining application and has not been accepted by Council at this time. Response: The proposed roadworks are nearly all above the Q100 flood line therefore flood plan effect is considered negligible. A small part of proposed cul-de-sac fill batter is in the flood plain however this has been accounted for in the Flood Study by BSM. Please refer to enclosed plan 1225-61a and 1225-62a which shows developed Q100 extents. Filling to lots 13-16 adjacent to floodplain has been completed using retaining walls to avoid negative impacts from subdivision construction works. Refer to 1225-61a and 1225-62a for details of retaining walls and flood line. 8. Provide a preliminary engineering design for the necessary stormwater drainage works. The design must be prepared by an RPEQ and include: a. Stormwater drainage from the roadworks and the proposed lots. b. Stormwater drainage to service the adjoining Lot 1 RP173883 and any structures necessary to address runoff from the adjoining properties. c. Stormwater detention and treatment devices for the relevant stage. Response: a. Please refer to enclosed Plan 1225-61a and 1225-62a which show the stormwater layout. There is interlot drainage to lots 13-16 which do not slope towards the road. b. Lot 1 RP173883 has been provided with a stormwater and sewer connection. There is not considered to be a need for structures to address stormwater runoff from adjacent properties as lots on Cordwood Drive have interlot stormwater pits. c. Stormwater detention is referred to in BSM report dated 15-9-14 in item 1 page 5. The bridge and bund detention referred to in the BSM report is shown on attached X:MOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC 14 0009 17-7-14.doc
Page 4
plan 1225-92a and long/cross section plan 1225-94a.
The stormwater quality treatment device for stage 5 is a bio-retention basin, refer to
plans 1225-61a and 1225-62a. The stormwater quality calculations for this bio-
retention basin were previously provided Stormwater Quality Management Plan for
REC13/0146 information request with our letter dated 24-4-14.
This basin also has a detention component which is included in BSM flood report
dated 15-9-14 Figure 12.
9. Provide amended plans that indicate the easements necessary to cater for the
proposed lots, the adjoining properties and any existing services that traverse
through the site.
Response:
Please refer to response and amended Plans from Max Watterson and Associates.
Yours faithfully,
Callaghan & Tot!
LE Wei x
A Haynes BE Civil RPEQ (civil) MIEAust CPEng
Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered
X:JOBSACT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC14 0009
17-7-14.doc