Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Response to Info_Request_stg6 REC14 0009 2-10-14 Callaghan Toth

Attached to the e-mail REC14/0009 Information Response.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Council Riparian Buffer Area on revegetation plan 1225-89a. This additional
rehabilitation south of the mapped Riparian extent provides an offset area for other
areas of Council mapping that are not practical to re-vegetate.

e Rehabilitation Plans have been prepared detailing the weed control, planting and
maintenance requirements for these riparian areas that will be rehabilitated.

e Itis considered that the Riparian Buffer Area as mapped on OM 3.1 is schematic to
indicate areas to be assessed on the ground and determine areas to be protected.

e The riparian buffer provided adjacent to Lots 14, 15 and 16 includes all the existing
riparian vegetation along this watercourse, i.e there is no riparian vegetation in Lot 14,
15 and 16. Most of the site including these lots is grassed as a result of previous
clearing and farming.

e By providing generally 10m from top of bank and rehabilitating this area the
development retains the existing habitat, maintains the existing wildlife corridor,
maintains the stability of the watercourse, and will enhance its values by removing
weeds and planting native species where infill planting is required.

e As such it is considered that the Biodiversity Overlay has been complied with by
providing a setback of a suitable distance to protect the values of the watercourse
and riparian zone. And by rehabilitating this area the biodiversity values of this
watercourse will be enhanced.

e Therefore the boundaries to Lot 14, 15 and 16 will be changed as per plan 1225-89a.

3. Please provide a proposal plan with the Noosa Plan’s Biodiversity Overlay overlaid to
provide clarity

Response:

Please refer to revegetation plan 1225-89a which shows the Biodiversity Overlay Riparian
extent.

Engineering and Hydrology
4. Provide a Flood Report for the development.

Response:
Please refer to Brisbane Stormwater Management (BSM) Flood Report dated 15-9-14.

5. The lot layout may require amending subject to Councils acceptance or other revision
of the Stormwater Detention and Flood Report.

Response:

The Flood report has been recently revised to address Council concerns so allotment layout
should not need to change.

X:JOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC14 0009
17-7-14.doc
Log in to download the original file

Response to Info_Request_stg6 REC14 0009 2-10-14 Callaghan Toth.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.