Original source · versioned page text
Response to Info_Request_stg6 REC14 0009 2-10-14 Callaghan Toth
Attached to the e-mail REC14/0009 Information Response.
Callaghan & Toth Consulting Engineers Pty Ltd ABN No. 45140292324 8/41 Sunshine Beach Road Noosa Junction P.O Box 2305 Noosa Heads 4567 Callaghan & Toth www.callaghanandtoth.com.au Civil, Environmental & Hydraulic Engineers Ph: 07 5474 9081 Fax: 07 54749041 2"? October 2014 Glen Conforti Development Planning Officer Noosa Council Via Email: [email protected] RE: Response to Information Request for Application to Reconfigure a Lot — 2 Lots into 6 Lots REC14/0009 Stage 6 In response to the Information Request dated 17 July 2014 the following details are offered (Council information request items in italics): Planning 1. Please provide the applicant’s intentions for vegetation rehabilitation and Park dedication should stage 3 be deferred or never occur. Response: Please refer to enclosed staged revegetation plans 1225-89a, and 1225-90a which show revegetation extents for stage 5 and 6. The stage 5 and 6 works will be to revegetate the eastern watercourse. Stage 3 will be future works to western watercourse. Max Watterson has prepared Park dedication plans which will be included in this information request response. Ecology 2. Provide an amended plan that meets the provisions of the Biodiversity Overlay Code. Response: The creek adjacent Stage 5 and 6 is partly mapped as Riparian Buffer Area on the Biodiversity Overlay map 3.1, which is shown on plan 1225-89a. e It is proposed to dedicate 10m from top of bank along this watercourse for its whole length to ensure the biodiversity values of the watercourse are maintained. One exception is adjacent to lot 15 which has a narrower width of 7.5m over 25m. This has been offset by increasing the dedication to 20m next to lot 16 and extending a 10m wide zone 70m south of the Biodiversity Overlay map 3.1. Please refer revegetation plan 1225-89a which shows extents of proposed planting as shaded areas. e It is proposed to rehabilitate 10m either side from the top of bank for part of this watercourse and 5m either side from the invert for the part of the watercourse which is not mapped as Riparian Buffer Area. This additional area is shown in relation to X:JOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC 14 0009 17-7-14.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.