Original source · versioned page text
Response to Info_Request_stg6 REC14 0009 2-10-14 Callaghan Toth
Attached to the e-mail REC14/0009 Information Response.
6. Provide a preliminary engineering design for the necessary road works. The design must be prepared by an RPEQ and extend from the existing formation in Cordwood Drive the the full length of ‘Masonry Street’. The design must include: Levels (natural surface and finished design) Cross Sections and Longitudinal Section All banks and batters Stormwater Existing services Temporary Turnaround (if required) ~D9AOTD Response: Please refer to enclosed layout plans 1225-61a, 1225-62a, Longitudinal Section 1225-65a, Cross sections 1225-66 to 1225-72 inclusive (revision a). On enclosed plan 1225-80a we show existing water main, communications, and underground electrical that is on the western side of Masonry Street. These services currently terminate at the southern boundary of Lot 12 SP248255. There are also existing sewer and water mains traversing the property in easements, see 1225-60a. It is planned to complete stages 5 and 6 in one Construction Contract therefore a temporary turnaround is not required. 7. Provide comment on the potential affects on the flood plain created by the proposed roadworks. Please note that the Q100 line indicated on the plans is part of the adjoining application and has not been accepted by Council at this time. Response: The proposed roadworks are nearly all above the Q100 flood line therefore flood plan effect is considered negligible. A small part of proposed cul-de-sac fill batter is in the flood plain however this has been accounted for in the Flood Study by BSM. Please refer to enclosed plan 1225-61a and 1225-62a which shows developed Q100 extents. Filling to lots 13-16 adjacent to floodplain has been completed using retaining walls to avoid negative impacts from subdivision construction works. Refer to 1225-61a and 1225-62a for details of retaining walls and flood line. 8. Provide a preliminary engineering design for the necessary stormwater drainage works. The design must be prepared by an RPEQ and include: a. Stormwater drainage from the roadworks and the proposed lots. b. Stormwater drainage to service the adjoining Lot 1 RP173883 and any structures necessary to address runoff from the adjoining properties. c. Stormwater detention and treatment devices for the relevant stage. Response: a. Please refer to enclosed Plan 1225-61a and 1225-62a which show the stormwater layout. There is interlot drainage to lots 13-16 which do not slope towards the road. b. Lot 1 RP173883 has been provided with a stormwater and sewer connection. There is not considered to be a need for structures to address stormwater runoff from adjacent properties as lots on Cordwood Drive have interlot stormwater pits. c. Stormwater detention is referred to in BSM report dated 15-9-14 in item 1 page 5. The bridge and bund detention referred to in the BSM report is shown on attached X:MOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 5\REC info req response\Response to C Info_Request_stg5 REC 14 0009 17-7-14.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.