Appendix A_Code Compliance Tables
Attached to the e-mail REC16/0015 Development Application.
Complies – The proposed building envelopes are
located clear of existing power infrastructure and
the site is not located in proximity to an existing
substation.
Earthworks and stormwater management
No solution provided Complies – Stormwater runoff will be managed
using soakwell pits to cater for a developable
2
area of 1,470m (refer enclosed Drainage Layout
Plan at Appendix C).
No solution provided Complies – The proposed subdivision does not
involve any filling or excavation within mapped
overlay constraints. Minor earthworks may be
necessary to accommodate the proposed
driveway access in order to improve it to comply
with Council’s standard driveway requirements.
Landscaping and visual amenity
Complies – There are no site works proposed
other than as required to upgrade the existing
driveway and locate new service connections.