Stormwater Management Report · MCU22/0087.01
Figure 0.2 – DRAINS Pre-development catchments
Figure 0.3 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 0.1 Existing and proposed site peak discharge rates.