Table 0.1 Existing and proposed site peak discharge rates (unmitigated)
A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%)
63.2% AEP 0.013 0.013 0.000 0%
50% AEP 0.019 0.019 0.000 0%
20% AEP 0.023 0.023 0.000 0%
10% AEP 0.030 0.030 0.000 0%
5% AEP 0.034 0.034 0.000 0%
2% AEP 0.039 0.039 0.000 0%
1% AEP 0.042 0.043 0.001 2%
Based on the modelling, the minor increase to impervious area from the proposed development will only result in
an increase of 1L/s for the 1% storm AEP event, being a change of only 2% The pre-post comparison found that
under all other storm events up to the 1% AEP analysed not resulting in an increase of the peak flows. As such, the
proposed development is considered to not impact the downstream receiving environment in a manner that will
alter the catchment hydrology or result in nuisance run-off that may impact downstream properties.
As peak outflows from the development are typically as per existing conditions, no stormwater attenuation is
required to control outflows from the proposed development.
P 1300 469 707 E [email protected]
Page 12 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.