2007/1894
4 ASSESSMENT MANAGER CONDITIONS
1 The applicant is required to lodge a further application for Operational Works in order to obtain
a Development Permit. The Development Permit will be issued upon the payment of
outstanding contributions and bonds required by the conditions of Decision Notice for Material
Change of Use – 2007/1010 and will be subject to the conditions contained herein. It must
also be noted that no works can commence prior to obtaining a Development Permit.
2 The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
3 Roof and surface runoff connection to Council’s kerb and channel/drainage system shall be as
shown on drawing No.17282-SW1. Kerb adaptors shall be used in the kerb.
4 A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
shall be flexible in that it addresses all stages of the development:-
4.1. A single nominated access location to and from the site.
4.2. The plan should detail the routing of trucks to and from the site.
4.3. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
4.4. Provision of safe cycle and pedestrian movements in the vicinity of the development
on Kingfisher Drive.
4.5. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
4.6. Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and Transport Infrastructure (Roads) Act.
4.7. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
5 Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
6 Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
7 The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
8 Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A849F.001.pdfRelated documentPublic source context ↗
Decision Notice (Preliminary Approval) - 010.2007.00001894.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.