4.3.2 MUSIC Meteorological Data
Cooroy DPI (Station 40059) meteorological data was selected for the MUSIC analysis. The
10-year climate period was selected in accordance with Table 3.1 of the guidelines. The
rainfall and evapo-transpiration data for the period of 01/01/1973 to 31/12/1983, with a 6-
minute time step was used in the model.
Input parameters for the rainfall-runoff, source nodes and treatment devices were also
obtained from the guidelines. The following parameters were selected based on a
commercial/industrial development.
4.3.3 Rainfall-Runoff Parameters
The rainfall-runoff parameters listed in Table 3.7 of MUSIC guidelines were used in the
model. The parameters recommended by the guideline are as shown in Table 4.4 below.
PARAMETER Commercial/Industrial
Rainfall threshold (mm) 1
Soil storage capacity (mm) 18
Initial storage (% capacity) 10
Field capacity (mm) 80
Infiltration capacity 243
Coefficient a
Infiltration capacity 0.6
Exponent b
Initial depth (mm) 50
Daily recharge rate (%) 0
Daily baseflow rate (%) 31
Daily deep seepage rate (%) 0
Table 4.4 Recommended rainfall-runoff parameters
4.3.4 MUSIC Pollutant Export Parameters Split Catchment Land Use (Commercial)
TSS log10
TP log10 values TN log10 values
Surface values
Flow Type
Type St. St. St.
Mean Mean Mean
dev. dev. dev.
Baseflow Roof N/A N/A N/A N/A N/A N/A
parameters
Roads 0.78 0.39 -0.6 0.50 0.32 0.30
Ground 0.78 0.45 -1.11 0.48 0.14 0.20
Level
Stormflow Roof 1.30 0.44 -0.89 0.36 0.25 0.32
Parameters
Roads 2.43 0.38 -0.30 0.34 0.37 0.34
Ground 1.92 0.44 -0.59 0.36 0.25 0.32
Level
Table 4.5 MUSIC Export Parameters Split Catchment Land Use (Industrial)
Site Based Stormwater Management Plan Page 11 of 22
1856-SBSMP-01_Version 5.0 (December 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.