Council archive · source document
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
4.3.5 MUSIC Treatment Node Parameters (Post Developed Site)
Bioretention Basins
Figure 4.33 to Figure 4.5 show the parameters for the bioretention basins.
Figure 4.3 Bioretention node parameters for the new North Roundabout
Figure 4.4 Bioretention node parameters for Upper Road C catchment (Combined Node)
Site Based Stormwater Management Plan Page 12 of 22
1856-SBSMP-01_Version 5.0 (December 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.