Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023

of 49

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Buffer

Figure4.13 shows the parameters for the buffer node in the MUSIC model. This is applied
where runoff from the bushfire access driveway pavement will runoff via sheet flow to the
surrounding ground




                                    Figure 4.12 Bufffer Node Parameters



4.3.6 MUSIC Model Results

Figure 4.14 shows the MUSIC model treatment train layout and results from the proposed
stormwater quality improvement devices (SQIDs), which is also shown on drawings
1856/SW01-SW05 in Appendix A. The results as shown below were generated using the
stochastic option as per the guidelines.




                                     Figure 4.14 MUSIC Model Results


Site Based Stormwater Management Plan                                         Page 17 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.