Council archive · source document
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
Buffer
Figure4.13 shows the parameters for the buffer node in the MUSIC model. This is applied
where runoff from the bushfire access driveway pavement will runoff via sheet flow to the
surrounding ground
Figure 4.12 Bufffer Node Parameters
4.3.6 MUSIC Model Results
Figure 4.14 shows the MUSIC model treatment train layout and results from the proposed
stormwater quality improvement devices (SQIDs), which is also shown on drawings
1856/SW01-SW05 in Appendix A. The results as shown below were generated using the
stochastic option as per the guidelines.
Figure 4.14 MUSIC Model Results
Site Based Stormwater Management Plan Page 17 of 22
1856-SBSMP-01_Version 5.0 (December 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.