Council archive · source document
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
All load-based pollutant reduction efficiencies are met in accordance with the Table A in Appendix 2: Stormwater Management Design Objectives, Part G, SPP (2017) included in Appendix B. The bioretention treatment nodes for the car parking pavements in Lots 12-15 are modelled as all the same size for consistency at planning stage. It is recommended that the MUSIC file be updated as part of the Operational Works design to correctly capture batters and extended detention, final pavement catchments etc. with the construction drawings for these works. The Noosa Plan, Division 20-Water Sensitive Design Code, table 14-61 Specific Outcome S1.5 requires that stormwater discharging to naturally acidic areas are managed to prevent eutrophication. Council representatives have identified that areas to the south of Lot 11 and 12, including the covenant land incorporated within Lot 12, are naturally acidic areas. To manage this, it is recommended that stormwater outlets from post treatment systems and runoff from both Lots 11 and 12 should occur to the surface at a lower level to the lot pad so that discharged water has sufficient room to disperse across the ground, absorbing nitrogen and reducing the runoff pH from contact with decomposing leaf litter. To achieve this, a rock pad generally in accordance with the design specification in QUDM-2017 is proposed at these outlet to the treatment system and pipe discharge for Lot 12, with the exception that the rock pad flares at 1:1 instead of 1:5 to encourage flow dispersion. The piped discharge for Lot 11 is to the drainage system in Road B. Any runoff from the rear of the lot is to be buffered by groundcover vegetation areas either side of the bushfire access track. This maintains the flow regime as sheet runoff and allows the surface water to be in contact with the soils and natural vegetation of the area as it moves south, to correctly balance the pH before entering the acidic areas. Site Based Stormwater Management Plan Page 18 of 22 1856-SBSMP-01_Version 5.0 (December 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.