Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

BR210522_SBSMP_Rev6

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                             Table of Contents
1      Introduction ......................................................................................................5
       1.1          Background ........................................................................................5
2      Scope ..............................................................................................................5
3      Criteria .............................................................................................................5
4      Site Characteristics ..........................................................................................6
       4.1          Location and Description ....................................................................6
       4.2          Watercourses and Topography ..........................................................7
       4.3          Existing Land Use and Proposed Development .................................7
       4.4          Existing Stormwater Infrastructure and Lawful Points of Discharge ....7
       4.5          Lawful Points of Discharge .................................................................7
5      Stormwater Management (Quantity) ................................................................8
       5.1          Hydrological Modelling .......................................................................8
       5.2          Catchment Summary .........................................................................8
       5.3          Rational Method Peak Flow Comparison ...........................................9
       5.4          Pre- and Post-Development Design Flow Rates (unmitigated) ...........9
       5.5          Proposed Design..............................................................................10
6      Stormwater Management (Quality) ................................................................12
       6.1          Water Quality Objectives ..................................................................12
       6.2          Operational Phase Management ......................................................13
       6.3          Construction Phase Management ....................................................17
7      Engineering Codes (Noosa Shire Council) .....................................................19
       7.1          Water Quality and Drainage Code ....................................................19
8      Conclusion .....................................................................................................20




BR210522_SBSMP_Rev6.docx                                                                                                         Page 3 of 25
Log in to download the original file

BR210522_SBSMP_Rev6.pdf · 17.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.