Table of Contents
1 Introduction ......................................................................................................5
1.1 Background ........................................................................................5
2 Scope ..............................................................................................................5
3 Criteria .............................................................................................................5
4 Site Characteristics ..........................................................................................6
4.1 Location and Description ....................................................................6
4.2 Watercourses and Topography ..........................................................7
4.3 Existing Land Use and Proposed Development .................................7
4.4 Existing Stormwater Infrastructure and Lawful Points of Discharge ....7
4.5 Lawful Points of Discharge .................................................................7
5 Stormwater Management (Quantity) ................................................................8
5.1 Hydrological Modelling .......................................................................8
5.2 Catchment Summary .........................................................................8
5.3 Rational Method Peak Flow Comparison ...........................................9
5.4 Pre- and Post-Development Design Flow Rates (unmitigated) ...........9
5.5 Proposed Design..............................................................................10
6 Stormwater Management (Quality) ................................................................12
6.1 Water Quality Objectives ..................................................................12
6.2 Operational Phase Management ......................................................13
6.3 Construction Phase Management ....................................................17
7 Engineering Codes (Noosa Shire Council) .....................................................19
7.1 Water Quality and Drainage Code ....................................................19
8 Conclusion .....................................................................................................20
BR210522_SBSMP_Rev6.docx Page 3 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.