Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

BR210522_SBSMP_Rev6

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

                                                      Appendices
Appendix A - Partial Detailed Survey and Council Online Mapping..............................21
Appendix B - Proposed Development Plans ................................................................22
Appendix C - Preliminary Stormwater Layout Sketch...................................................23
Appendix D - Catchment Plan .....................................................................................24
Appendix E - Water Quality and Drainage Code ..........................................................25

                                                   List of Figures
Figure 1 - Site Location .................................................................................................6
Figure 2 – MUSIC Model Layout (Bio-Retention) .........................................................15

                                                    List of Tables
Table 1 - ILSAX Hydrological Model Parameters ...........................................................8
Table 2 –Pre-Development Parameters.........................................................................8
Table 3 - Comparison of Pre- and Post-Development Peak Flow Rates ........................9
Table 4 - Comparison of Pre- and Post-Development Design Flow Rates .....................9
Table 5 – Detention Basin Details................................................................................10
Table 6- Comparison of Pre- and Post-Development (Mitigated) Peak Flow Rates .....11
Table 7 - Comparison of Pre- and Post-Development (Mitigated) Peak Flow Rates
         (Climate Change)...........................................................................................11
Table 8 - Monthly Evapotranspiration ..........................................................................13
Table 9 - Music Source Parameters ............................................................................14
Table 10 – Commercial Source Node MUSIC Input Parameters .................................14
Table 11 - MUSIC Model Catchments .........................................................................15
Table 12 - Rainwater Tanks.........................................................................................15
Table 13 - Bio-Retention Details ..................................................................................16
Table 14 - Treatment Train Effectiveness Result .........................................................16




 BR210522_SBSMP_Rev6.docx                                                                                                     Page 4 of 25
Log in to download the original file

BR210522_SBSMP_Rev6.pdf · 17.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.