Photo J – Pier 3, Core B, taken in top of pilecap beam, Photo K – Pier 3, Core B taken in top of pilecap beam,
near side. ASR crack from surface to reo level. near side. Ligatures x 2 corroded to depth of 3mm
approximately, say 20-30% of strength left. Main bar
has surface rust only. 100mm cover to ligatures.
Photo L – Pier 3, Core C, taken in side of pilecap beam. Photo M – Pier 3, Core C, taken in side of pilecap beam.
ASR crack from surface to reo level Ligature almost completely rusted away. 89mm cover
to ligature.
Photo N – Pier 4, coring down to visually see condition Photo P – Pier 4, cores taken from concrete
of reinforcement
Page 19 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.