2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Photo Q – Pier 4, Cores 1 & 2 taken in top of pilecap Photo R – Pier 4, Core 3 taken in top of pilecap beam,
beam, 380mm and 600mm away from side respectively. 135mm from side. Main bar in good condition. Ligature
Ligatures in good condition. 100mm cover. top in good condition, some corrosion visible at
corner. 100mm cover.
Photo S – Pier 4, Core 4A taken in side of pilecap beam, Photo T – Pier 4, Core 4A. ASR crack extends from side
near bottom. Rust stains and ASR crack at surface face in to reo bar. Significant corrosion of main bar.
105mm cover
Photo U – Pier 5, Core A taken in top of pilecap beam, Photo V – Pier 5, Core A taken in top of pilecap beam,
near side. ASR crack extends from surface to reo level near side. Main bar in perfect condition. 139mm cover
to main bar.
Page 20 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.