Original source · versioned page text
2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Appendix B – Original drawings of bridge
See attached file: AppendixB MunnaPointBridgedrawings.pdf
Appendix C – Design loads
Original design vehicle: T44 vehicle (nominally equivalent to semi-trailer tipper, 44 tonnes)
Appendix D – Risk Assessment methodology
Page 30 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.