Original source · versioned page text
2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
The Risk Matrix (excerpt from Jacobs Sverdrup – “Working with the Risk Assessment
Matrix”)
Appendix E – ALS Industrial field & lab testing report
See attached file: AppendixE_ALSIndustrialLabReport.pdf
Appendix F – Bridge Condition & Repair staging drawings
(not for construction)
See attached file: AppendixF_MunnaPointBridgerepairs.pdf
Appendix G – Previous reports by TMR, Opus & Arup
See attached file: AppendixG_MunnaPointBridge_PreviousReports.pdf
Page 31 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.