Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

  The Risk Matrix (excerpt from Jacobs Sverdrup – “Working with the Risk Assessment
                                       Matrix”)




Appendix E – ALS Industrial field & lab testing report

See attached file: AppendixE_ALSIndustrialLabReport.pdf




Appendix F – Bridge Condition & Repair staging drawings
(not for construction)

See attached file: AppendixF_MunnaPointBridgerepairs.pdf




Appendix G – Previous reports by TMR, Opus & Arup

See attached file: AppendixG_MunnaPointBridge_PreviousReports.pdf




                                       Page 31 of 31
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.