Page 11
5.6.2 Post-Development Unmitigated
Figure 5.1 shows the XP-RAFTS model used to represent the post-development unmitigated site
conditions and Table 5.3 summarises the input parameters used in the model for the post-
development unmitigated site scenario.
Node Roof represents the post-development roof area of the proposed medical centre. Node
Ground represents the exposed car parking areas, the exposed ramp and remainder of the site.
LPD represents the legal point of discharge.
Figure 5.1 - XP-RAFTS Post-Development Unmitigated Model
Table 5.6 – XP-RAFTS Source Node Parameters – Post-Development Site
Post-Development Site
Roof Node Ground Node
Parameter
Sub Catchment 1 Sub Catchment 2 Sub Catchment 1 Sub Catchment 2
(Pervious) (Impervious) (Pervious) (Impervious)
Initial Loss (mm) 0 0 0 0
Continuous Loss (mm/hr) 0 0 2.5 0
Catchment Area (ha) 0 0.2241 0.0777 0.1307
Impervious Percentage 0% 100% 0% 100%
Vectored Slope 0% 4.4% 7.1% 3%
Manning's "n" 0 0.015 0.035 0.015
IFD Coefficients Noosaville Noosaville Noosaville Noosaville
Storage Coefficient N/A N/A N/A N/A
Table 5.7 summaries the post development unmitigated peak flows calculated by XP-RAFTS for
a range of design storms. As a check to ensure the peak flows calculated from XP-RAFTS are
sound, peak flows utilising the Rational Method were calculated and have been also listed in
Table 5.7 (refer Appendix F for detailed Rational Method calculations).
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.