Stormwater Management Plan · MCU15/0122

Attached to the e-mail MCU15/0122 Development Application - Stormwater Management Plan Email 3 of 5..

of 55

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                                                                                          15099 - SBSMP/2
                                                                                                    Page 10




                   Table 5.4 - XP-RAFTS Source Node Parameters – Pre-Development Site
                                                             Pre-Development Site
                                                                 Existing Node
                            Parameter
                                                     Sub Catchment 1      Sub Catchment 2
                                                        (Pervious)          (Impervious)
                          Initial Loss (mm)                  0                    0
                      Continuous Loss (mm/hr)               2.5                   0
                        Catchment Area (ha)               0.2927               0.1398
                       Impervious Percentage                0%                  100%
                            Vectored Slope                 4.4%                 8.0%
                             Manning's "n"                 0.050                0.015
                           IFD Coefficients             Noosaville            Noosaville
                         Storage Coefficient                N/A                  N/A


Table 5.5 summaries the pre-development peak flows calculated by XP-RAFTS for a range of
design storms. As a check to ensure the peak flows calculated from XP-RAFTS are reasonable,
peak flows utilising the Rational Method were calculated and have also been listed in Table 5.5
(refer Appendix F for detailed Rational Method calculations).

         Table 5.5 – Pre-Development Peak Discharge (XP-RAFTS and Rational Method)

                                        XP-RAFTS                           RATIONAL METHOD
             ARI
                                 Existing Peak Discharge                  Existing Peak Discharge
           (years)
                                          (m3/s)                                   (m3/s)
                                           0.150
              2                                                                   0.100
                                     (2yr 25min storm)
                                           0.199
              5                                                                   0.138
                                     (5yr 25min storm)
                                           0.222
              10                                                                  0.161
                                     (10yr 25min storm)
                                           0.255
              20                                                                  0.192
                                     (20yr 25min storm)
                                           0.271
              50                                                                  0.243
                                     (50yr 25min storm)
                                           0.301
             100                                                                  0.279
                                     (50yr 25min storm)


For pre-development peak flow rate hydrographs from XP-RAFTS refer to Appendix D.




Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.