5.7 Comparison of Peak Flows at the Legal Point of Discharge
All roof runoff generated from the propose development will be detained within the detention
basin. Table 5.6 below provides a comparison of the pre-development and post-development
(mitigated) peak flows at the legal point of discharge (LPD) for the proposed development.
Table 5.6 - Comparison of Peak Flows at the LPD
XP-RAFTS XP-RAFTS
ARI Difference
Pre-developed Flows Developed Flows (Mitigated)
(years) (m3/s) (m3/s) (m3/s) %
0.150 0.133
2 -0.017 -11.3
(2yr 25min storm) (2yr 25min storm)
0.199 0.182
5 -0.017 -8.5
(5yr 25min storm) (5yr 25min storm)
0.222 0.204
10 -0.018 -8.1
(10yr 25min storm) (10yr 25min storm)
0.255 0.231
20 -0.024 -9.4
(20yr 25min storm) (20yr 25min storm)
0.271 0.243
50 -0.028 -10.3
(50yr 25min storm) (50yr 25min storm)
0.301 0.274
100 -0.027 -9.0
(50yr 25min storm) (100yr 25min storm)
Notes:
1. Additional detention volume will be achieved in the internal roofwater and stormwater pipes.
The XP-RAFTS hydraulic modelling has demonstrated that the proposed on-site detention to be
implemented will maintain pre-development flows (or less) for all design storms at the LPD.
Refer Appendix D and to Appendix E for peak flows at the LPD for the pre-development and
post-development mitigated site, as summarised in Table 5.6 above.
Refer to Appendix C for concept drainage plans of the proposed development.
This plan is required to be confirmed during detailed design to ensure that the operational
requirements are considered suitable. Substantial changes may require resubmission of this
report to the local authority.
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.