Council archive · source document
Stormwater Management Plan · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Stormwater Management Plan Email 3 of 5..
Plans and drawings: the text below has words only, no drawings.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
15099 - SBSMP/2
Page 15
6 STORMWATER QUALITY
The following section of this report outlines the potential contaminants and proposed solutions
to be incorporated during the construction and operation of this development.
6.1 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan to be prepared by Morgan Consulting Engineers and kept on
site during the construction phase.
Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.1 together with proposed stormwater quality improvement devices,
management and maintenance procedures.
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.