Stormwater Management Plan · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Stormwater Management Plan Email 3 of 5..
Plans and drawings: the text below has words only, no drawings.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
15099 - SBSMP/2
Page 9
5.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre- and
post-development conditions and Appendix F for the Rational Method calculations.
Table 5-3 – Pre and Post-Development Peak Flows
Property State Q10 (m3/s) Q100 (m3/s)
Pre-development 0.161 0.279
Post-development 0.230 0.386
It is evident that there will be an increase between the pre-development and post-development
peak discharge flow rates. On-site detention will therefore be required to mitigate the
increased discharge flow rates to ensure pre-development flow rates can be achieved.
5.6 On-Site Detention Analysis
XP-RAFTS has been used to model the peak discharges from the site under both existing (pre-
development) and proposed (post-development) conditions, and to determine the sizing
requirements of the detention basin as outlined in Section 5.05.2 of the QUDM.
5.6.1 Pre-Development
Figure 5-1 shows the XP-Rafts model used to represent the pre-development site conditions and
Table 5.4 summarises the input parameters used in the model for the pre-development site
scenario.
Figure 5-1 –XP-RAFTS Pre-development Model
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.