2021-06-17 OM Agenda - Item 2 - Attachment 1 - Draft Noosa Bushland Reserve Strategic Management Plan 2021-2026
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn7. Noosa Reserve Management Framework 2021-2026 Council will follow best practice management principles throughout its Natural Areas Program. Best practice bushland management principles are detailed in the SE Qld Ecological Restoration Framework Guideline and Manual (Chenoweth 2012) and are focused on developing ecosystem resilience. This is defined as the ability of an ecosystem to recover its structure and function following a disturbance event. The five key principles are: Restored ecosystems incorporate assemblages of species reflecting those in reference ecosystems and have the potential to recruit further species by natural means; Restored ecosystems support the same structure and function as reference ecosystems; Restored ecosystems consist of indigenous species of local provenance to the greatest extent practicable; Restored ecosystems are self-sustaining to the same degree as a reference ecosystem, such that they are resilient to normal periodic stress; and, Restored ecosystems interact with the surrounding landscape and contribute to ecosystem services. Of the four approaches to ecosystem restoration outlined in the manual, Council has adopted natural regeneration and assisted natural regeneration as priority approaches. This works best where evidence of ecosystem resilience is apparent within the reserve as determined by a Bushland Operational Assessment. Where evidence indicates that ecosystem resilience is absent from a reserve or sections of a reserve, ecosystem reconstruction (revegetation/ direct seeding) may be necessary. However it can be an expensive option in relation to establishment and ongoing maintenance costs. In most cases, assisted natural regeneration through targeted actions, such as controlling invasive species, is appropriate for Council’s bushland reserve network. The intent within a reserve is to improve the resilience rating of all sites within the reserve over time, with a priority on working on the best most resilient areas first. The exception to this is where outlier transformer weeds are present in a reserve and require control to prevent further spread. Best Practice Guidelines and triage (looking after the best areas first) approaches to developing strategic works programs have guided the following Management Framework, Reserve Prioritisation and Management Program Category approaches. 7.1 Formal Management Framework A clear and transparent framework for planning is necessary to guide on ground works that achieve Council’s objectives within the limited funding resources that exist. A clear and transparent adaptive planning process also allows Council to track the progress of works against targets and change actions if necessary. Typical adaptive planning processes follow a Plan – Do – Review process, but most importantly, they need to include sound monitoring and evaluation components. Figure 16 outlines the management framework that will be adopted for the Natural Areas program. Noosa Bushland Reserves Strategic Management Plan 2021 – 2026 Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.