2021-06-17 OM Agenda - Item 2 - Attachment 1 - Draft Noosa Bushland Reserve Strategic Management Plan 2021-2026
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 16 - The Noosa bushland reserves management framework
The Strategic level components of the Management Framework are:
1) The Noosa Bushland Reserves Strategic Management Plan (this document).
2) Reserve Prioritisation
A detailed analysis of the 178 reserves has been undertaken to identify where resources
should be allocated. The process is informed by GIS analysis and Expert Panel review and
data is housed in a formatted excel spreadsheet. Five tiers of reserve prioritization scoring
within the prioritisation process are identified.
3) Reserve Management Program Category Allocation
The Reserve Management Program categories outline the management intent, planning
response and on-ground effort allocated and planned for each reserve. They include the
categories of ‘Protect’, ‘Enhance’ or ‘Monitor’. The Management Program Category identifies
the anticipated and planned type, frequency and extent of management resources allocated to
each reserve.
The intent of each Management Program category is as follows:
Protect Program
Aims to preserve the current vegetation condition of a reserve through the undertaking of minor
restoration works (<5 years in duration) where necessary as a result of annual inspections and
/ or in accordance with a Bushland Reserve Management Plan if one is necessary for the site
due to conflicting management issues.
Enhance Program
Aims to intensify, increase, or further improve the condition, value, and/or extent of vegetation
within a reserve. Works undertaken in accordance with a current Bushland Reserve
Management Plan (where one is necessary for the site due to conflicting management issues),
and subordinate Ecological Restoration Plan and/or BOA.
Noosa Bushland Reserves Strategic Management Plan 2021 – 2026 Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.