08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
WILD RIVER AREA
4.15 Isapfo the operational work proposed to be carried out in 2 wild river area declared under the Wild River Act 2005?
No-Gotoas1e [[] Yes
if yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
{i) Agricultural activities as defined under the Wild Rivers Act 2005
(No 1 Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005
(No (1 Yes
Iyes to either (i} or (ii) above. is any part of the premises in the wild river high preservation area?
Cl Yes - An application for the operational work will be laken to be not property made and the Assessment Manager must refuse to receive tt.
[No
ff no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 20057
a Yes - An application for the operational work will be taken tc b@ not properly made and the Assessment Manager must reluse to receive it,
oO No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1. Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the
relevant wild fiver area, this application requires assessment by the Department of Natural Resources and Water (NAIM). If NRYW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
PA, soneauld dat t iaaig d, foe WGP eguithen setodue 2. table 2 lent 52, Waa Rivars Act 2d08 sechins 42, Io4
STATE-CONTBOLLED ROAD
4.16 |\s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controited road?
[No ~Endot sections (] Yes
H yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
{i) A material change of use that is assessable under the planning scheme (no [Yes
(i) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [No [[] Yes
abutting the State-controlled road
If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule 8 ~ Answer (a} - (c} below.
(a) {s any of the proposed operational work associated with access to a State-controlled road?
LI No (11 Yes - mis application must be relemed to the Department of Main Roads (OMA} as Concurrence Agency.
(b) is any of the proposed operational work for filling or excavation?
CINo (Yes
Ityes, is the operational work proposed in a future State-controlled road not defined by route?
Cj No - This application must be referred to the Department of Main Roads (DMR) as Concurence Agency.
J Yes - This application must be referred to the DMA as Advice Agency.
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cem? that directs stonmwater to a State-controlied road?
CNo CO Yes
if yes, is the operational work proposed in a future State-cantrolled road not defined by route?
C No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - This application must be referred to the DMR as Advice Agency.
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.